Line 3 (Hanoi Metro)

Line 3
Line 3 (Hanoi Metro)
View of the metro line at Chùa Hà station (middle)
Overview
Native nameTuyến 3
StatusCompleted (elevated section), 79.5% complete (underground section) as of June 2026
OwnerHanoi People's Committee
Line number3
Termini
StationsPhase 1 (Nhon - Hanoi Station): 8 (current)
Websitehanoimetro.net.vn
Service
TypeRapid transit
SystemHanoi Metro
OperatorHanoi Metro Company (HMC)
DepotNhon Depot
Rolling stock10 4-carriage Alstom Metropolis trains (40 carriages)
Ridership8,600 passengers/hour/direction
History
Planned openingLate 2027 (for Kim Mã ‐ Hanoi station)
Opened8 August 2024 (2024-08-08) (elevated section)
Technical
Line lengthPhase 1: 12.5 km (7.8 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
ElectrificationThird rail, 750 V DC
Operating speed35 km/h (22 mph)
80 km/h (50 mph) maximum
Route map

Nhon Depot
T3-S01
Nhon
T3-S02
Minh Khai
Left arrow Son Đong – Hoang Quoc Viet Right arrow
T8
T3-S03
Phu Dien
Bac Hong – Van Dien railway
Nhue River
T3-S04
Cau Dien
T3-S05
Le Duc Tho
Ringway 3
Left arrow Hoang Liet – Phu Dien Right arrow
T8
T3-S06
National University
Left arrow Thuong Đinh – Lien Ha Right arrow
T4
T3-S07
Chua Ha
Ringway 2
T3-S08
Cau Giay
Left arrow Thach Binh – Quan Ngua Right arrow
Line 5 (Hanoi Metro)
T3-S09
Kim Ma
Line 2A (Hanoi Metro)
T3-S10
Cat Linh
T3-S11
Van Mieu
Left arrow Ngoc Hoi – Yen Vien Right arrow
Line 1 (Hanoi Metro)
T3-S12
Ha Noi
T3-S13
Hang Bai
Left arrow Thuong Dinh – Xuan Dinh Right arrow
T2
T3-S14
Tran Thanh Tong
T3-S15
Kim Nguu
Ringway 2
T3-S16
Mai Dong
Left arrow Thuong Dinh – Me Linh Right arrow
T4
T3-S17
Tan Mai
T3-S18
Tam Trinh
Left arrow Hoang Liet – Duong Xa Right arrow
T8
Ringway 3
T3-S19
Yen So

Line 3 of the Hanoi Metro (Vietnamese: Tuyến số 3 đường sắt đô thị Hà Nội) is a rapid transit line in Hanoi, Vietnam. The line currently runs from Nhổn, a suburb in Bắc Từ Liêm District, west of city center, to its current terminus in Cầu Giấy Bus Interchange, located in Cầu Giấy district. When fully operational, the line will continue eastbound toward Hanoi Station, providing a direct connection to downtown Hanoi and the city's main railway station. The line operates between 5.30 am and 10pm, with headways of 6 minutes during peak hours (7 am - 8.30 am and 4.30 pm to 6pm), and 10 minutes during off-peak hours. All trains on Line 3 operate with a 4-cars formation.

This line was the first to be built in Hanoi Metro network, starting construction in September 2010 with an expected completion date in late 2016, with a budget of 18 trillion VND (US$1 billion in 2010) However, the project was plagued with delays and budget overrun, total about 34.532 trillion VND (US$1.46 billion) in 2022.

The line is divided into three segments: The first segment, which runs from Nhổn to Hanoi Station. This segment is 12.5 kilometres (7.8 mi) long, consists of 12 stations in total, with the first 8.5 kilometres (5.3 mi) (between Nhon and Cau Giay) running elevated, while the last 4 kilometres (2.5 mi) (between Cau Giay) and Ha Noi running underground. In addition, there have been plans for a southern extension (second segment), which will run from Hanoi Station to southern district of Hoàng Mai, and a northern extension (third segment) toward Sơn Tây. Currently, only the elevated phase of first segment (between Nhon and Cau Giay) is operational. About 20% of Hanoi's population in 6 districts Ba Đình, Cầu Giấy, Đống Đa, Hoàn Kiếm, Nam Từ Liêm and Bắc Từ Liêm can benefit from this line.