Line 2 (Ho Chi Minh City Metro)

Line 2
L2
Overview
Native nameTuyến 2
StatusUnder construction
OwnerHo Chi Minh City
LocaleHo Chi Minh City, Vietnam
Termini
Stations17 (under construction)
61 (planned)
Service
TypeRapid transit
System Ho Chi Minh City Metro
OperatorManagement Authority of Urban Railways in Ho Chi Minh City (MAUR)
DepotTham Lương
Rolling stockHyundai Rotem, 3 cars per train set
History
Planned opening2030 - 2032 (planned)
Technical
Line length17.5 kilometers (10.9 mi) (under construction)
62.2 kilometers (38.6 mi) (planned)
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification1,500 V DC from overhead catenary
Operating speed35 km/h (22 mph)
80 km/h (50 mph) (maximum)
Route map

North–South High-Speed Railway
Thủ Thiêm–Long Thành Metro
Up arrow Sông Tắc Bus Terminal
High Tech Park Right arrow
L10
L2-01
Thủ Thiêm
L2-02
Bình Khánh
Phong Phú Right arrow
L10
Cá Trê Canal
L2-03
International Hospital
L2-04
Young Pioneer Palace
Central Lake
L2-05
Tố Hữu
Left arrow Thao Dien – Tân Kiên Right arrow
L7
L2-06
Hàm Nghi
UpperLeft arrow Suoi Tien Terminal
UpperLeft arrow Đông Thạnh
L4
Cần Giờ Right arrow
L2-07
Ben Thanh
Hiệp Phước Residential Area LowerRight arrow
L4
An Hạ LowerRight arrow
L2-08
Tao Đàn
Left arrow Hiệp Bình Phước – Tân Kiên Right arrow
L3
Đa Phước UpperRight arrow
L8
L2-09
Dân Chủ
UpperLeft arrow Bình Triệu
L9
L2-10
Hòa Hưng
HCMC University of Technology Right arrow
L9
North–South Railway
Left arrow Tân Chánh Hiệp
L8
Saigon Locomotive Enterprise
L2-11
Lê Thị Riêng
L2-12
Phạm Văn Hai
L2-13
Bảy Hiền
Left arrow Tan Cang – New Cần Giuộc Bus Terminal Right arrow
L5
L2-14
Nguyễn Hồng Đào
Âu Cơ UpperRight arrow
L6 L9
L2-15
Bà Quẹo
An Hạ Right arrow
L9
LowerLeft arrow Bình Triệu
L6
L2-16
Phạm Văn Bạch
L2-17
Tân Bình
Tham Lương - Bến Cát - Nước Lên Canal
Left arrow High Tech Park – Hồ Học Lãm Right arrow
L10
Tham Lương Depot
L2-18
Tân Thới Nhất
L2-19
Hưng Thuận
L2-20
An Sương Bus Terminal
L2-21
Quảng Đức
Nguyễn Ảnh Thủ Street
L2-22
Tân Xuân
L2-23
Bà Triệu
L2-24
Lý Thường Kiệt
L2-25
Thống Nhất
L2-26
Tân Thới
L2-27
Tân Hiệp
Xáng Lớn Canal
L2-28
An Hạ
Left arrow Bình Mỹ Depot
L2-29
District Road 2
L2-30
Tân Phú Trung
L2-31
Lê Minh Nhựt
L2-32
Tân Thông Hội
L2-33
Trần Văn Chẩm
L2-34
Huỳnh Văn Cọ
Provincial Road 8
L2-35
Củ Chi
L2-36
Củ Chi Hospital
L2-37
Nguyễn Thị Rành
L2-38
Trung Viết
L2-39
Cây Trôm
L2-40
Phước Hòa
L2-41
Phước Thạnh
L2-42
Provincial Road 7
Down arrow Trảng Bàng (Tây Ninh)

Line 2 of the Ho Chi Minh City Metro (Vietnamese: Tuyến số 2 của hệ thống đường sắt đô thị Thành phố Hồ Chí Minh) is an under construction rapid transit line in Ho Chi Minh City, Vietnam. Line 2 is the city's second metro line, and will connect the former District 1 with District 2 to the east and District 12 and more further is Hóc Môn and Củ Chi to the northwest. The construction's phase 1, known as Bến Thành – Tham Lương began in January 2026; and phase 2, known as Bến Thành – Thủ Thiêm began three months after, with an expected completion date for both phases in 2030. The phase 1 length is 11.3-kilometer (7.0 mi) long with eleven stations and phase 2 is 6.2-kilometer (3.9 mi) six stations.

The loan was to be provided by the Asian Development Bank (ADB), the German Development Bank (KfW), and the European Investment Bank (EIB). The project's total cost is VNĐ47,900 billion (US$2.04 billion). However, they later decided that the state budget would fund the project instead.