Kozhikode Metro

Kozhikode Metro
Overview
LocaleKozhikode, Kerala, India
Transit typeRapid Transit
Number of lines
1 (Phase I)
Number of stations
22 (Phase I)
Operation
Operation will start
TBD
OperatorKochi Metro Rail Limited
CharacterElevated
Train length3 Coaches
Technical
System length44 kilometres (27 mi)
No. of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification750 V DC third rail
Top speed80 km/h (50 mph)

Kozhikode Metro is a proposed rapid transit system for the city of Kozhikode, in India. In 2010, the State government explored the possibility of implementing a metro rail project for Kozhikode city and its suburbs. The proposal was to have a corridor connecting Meenchanda to the Kozhikode Medical College Hospital through the heart of the city. An inception report was submitted by a Bangalore-based consultant, Wilber Smith, on the detailed feasibility study on the prospect of implementing the Mass Rapid Transport System (MRTS) and Light Rail Transit System (LRTS) in the city. However, the project has been scrapped to be replaced by Kozhikode Metro project.

The Kozhikode Light Metro project was actively pushed by the UDF government under Chief Minister Oommen Chandy, with the foundation stone laid in March 2016 for a 13.3-km stretch. Chandy's administration aimed to mirror the success of the Kochi Metro by initiating works, but the project later faced delays and administrative changes after the LDF government took over.

The State Cabinet then decided to form a special purpose vehicle (SPV) to implement monorail projects in Kozhikode and Thiruvananthapuram, and administrative sanction was given in October 2012. The state government issued orders entrusting the Thiruvananthapuram Monorail project to the KMCL on 26 November 2012. The government had handed over the Kozhikode Monorail project to the KMCL prior to that. On 12 June 2013, the State Cabinet gave clearance for an agreement to be signed between KMCL and DMRC, that would make the latter the general consultant for the monorail projects in Kozhikode and Thiruvananthapuram. The DMRC will receive a consultancy fee of 3.25% of the ₹ 55.81 billion (₹ 35.90 billion for Thiruvananthapuram and ₹ 19.91 billion for Kozhikode). The agreement was signed on 19 June 2013.

However, due to cost overrun and the cold response from the bidders the project was put on hold. Bombardier Transportation was the only bidder for the project. The project was later scrapped and Light metro was proposed.

In the 2025-2026 Kerala Budget, Finance minister KN Balagopal plans to develop the Kozhikode Metro project after the completion of the Thiruvananthapuram Metro.

Later, the plans was changed to make a full fledged Metro instead of a lite Metro, citing the cost for building lite metro will be higher due to importing of components, but due to the regular Metro having robust production facility in india it would be the one having lower cost.