Karuma Hydroelectric Power Station
| Karuma Hydro Power Station | |
|---|---|
Karuma Bridge | |
Karuma Hydro Power Station Map of Uganda showing the location of Karuma Falls Karuma Hydro Power Station Karuma Hydro Power Station (Africa) Karuma Hydro Power Station Karuma Hydro Power Station (Earth) | |
| Official name | Karuma Hydropower Station |
| Country | Uganda |
| Location | Karuma Falls |
| Coordinates | 2°14′55″N 32°16′06″E / 2.24861°N 32.26833°E |
| Status | Operational |
| Construction began | 16 December 2013 |
| Opening date | 26 September 2024 |
| Construction cost | US$1,688,380,000 |
| Owner | Ugandan government |
| Operator | Uganda Electricity Generation Company Limited (UEGCL) |
| Dam and spillways | |
| Type of dam | Mass concrete |
| Impounds | Victoria Nile |
| Height | 14 |
| Length | 314.43 |
| Elevation at crest | 1032 |
| Spillways | 8 |
| Reservoir | |
| Total capacity | 79,870,000 cubic metres (2.820582431×109 cu ft) |
| Normal elevation | 1,000 m (3,300 ft) |
| Power Station | |
| Operator | UEGCL |
| Commission date | 26 September 2024 |
| Type | Run of the river |
| Hydraulic head | 71 metres (233 ft) |
| Turbines | 6 x 100 MW (Francis) |
| Installed capacity | 600 MW |
| Annual generation | 4,373 GWh |
The Karuma Hydroelectric Power Station is an operational 600 MW hydroelectric power station in Uganda. It is the largest power-generating installation in the country. The project was awarded to Chinese engineering firm Sinohydro Corporation, a contracting subsidiary of the state-owned Power China.
The project has faced major delays and rising costs. Initially planned for completion in 60 months, the project has stretched to about 114 months, roughly a 4.5-year delay. This prolonged timeline has significantly increased expenses. The original budget of about $1.7 billion (SH$6.323 trillion) has climbed to roughly SH$8.18 trillion, with additional costs including about 113.9 billion shillings in accrued interest due to delayed payments.