Inner West Light Rail
| Dulwich Hill Line | |
|---|---|
A CAF Urbos 3 at Marion in 2014 | |
| Overview | |
| Other name | Inner West Light Rail |
| Owner | Transport for NSW |
| Locale | Sydney, New South Wales, Australia |
| Termini |
|
| Stations | 23 |
| Service | |
| Type | Light rail |
| System | Sydney light rail |
| Operator | Transdev Sydney |
| Depot(s) | Pyrmont, Lilyfield |
| Rolling stock |
|
| Ridership | 8,499,867 (2025) |
| History | |
| Work began | January 1996 |
| Opened |
|
| Technical | |
| Line length | 12.8 km (8.0 mi) |
| Number of tracks | 2 |
| Character | Street running, ground level, underground and elevated |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
| Electrification | 750 V DC from overhead catenary |
| Operating speed | 80 km/h (50 mph) |
The Inner West Light Rail, also known as the L1 Dulwich Hill Line, is a light rail line in Sydney, New South Wales, Australia, running from Central station through the Inner West to Dulwich Hill station. Operated by Transdev Sydney under contract to Transport for NSW, the line is 12.8 kilometres (8.0 mi) long and has twenty-three stops. The majority of the line runs along the route of the former Rozelle–Darling Harbour Goods Line; a small portion at the eastern end runs through streets in Sydney's central business district.
In 1994, the Sydney Light Rail Company was awarded a 30.5-year contract to build and operate the line. The first section, 3.6 kilometres (2.2 mi) from Central to Wentworth Park in Pyrmont with ten stops, opened on 11 August 1997. A 3-kilometre (2 mi), four-stop extension to Lilyfield opened on 13 August 2000. Following the closure of the remaining section of the goods line in 2009, planning commenced for an extension to Dulwich Hill. In 2012, the state government acquired the private operator, now known as Metro Transport Sydney. Construction began soon thereafter; the nine-station, 5.5-kilometre (3.4 mi) extension opened on 27 March 2014.
The line initially had seven Adtranz Variotram vehicles operate on it. From 2014, twelve CAF Urbos 3 trams were introduced, which allowed for the withdrawal of the Variotrams from service. Four more Urbos 3 trams were ordered in 2021 to reduce overcrowding. Due to cracking in the Urbos 3 bogies, the Inner West Light Rail was temporarily closed from October 2021; it reopened in February 2022 using Alstom Citadis trams from the CBD and South East Light Rail; the Urbos 3 trams were repaired later that year. The current timetable reaches headways as low as six minutes during peak periods and as high as fifteen minutes at night time. The travel time from end-to-end is about thirty-six minutes. Patronage was initially lower than expected, but exceeded forecasts after the extension to Dulwich Hill opened. In 2025, the line carried 8,499,867 passengers.