H3 (rocket)
Launch of a H3 rocket carrying the QZS-6 satellite on 2 February 2025 | |
| Function | Medium-lift launch vehicle |
|---|---|
| Manufacturer | Mitsubishi Heavy Industries |
| Country of origin | Japan |
| Cost per launch | H3‑30: ¥5 billion (2023) (equivalent to ¥5.13 billion or US$33.92 million in 2024) |
| Size | |
| Height |
|
| Diameter | 5.27 m (17.3 ft) |
| Mass |
|
| Stages | 2 |
| Capacity | |
| Payload to LEO (ISS) | |
| Altitude | 420 km (260 mi) |
| Orbital inclination | 51.64° |
| Mass | H3‑24: 16,000 kg (35,000 lb) |
| Payload to SSO | |
| Altitude | 500 km (310 mi) |
| Orbital inclination | 90° |
| Mass | H3‑30: 4,000 kg (8,800 lb) |
| Payload to GTO (Δ-v 1,500 m/sec) | |
| Mass | H3‑24: 7,900 kg (17,400 lb) |
| Associated rockets | |
| Based on | H-IIA · H-IIB |
| Comparable | |
| Launch history | |
| Status | Active |
| Launch sites | Tanegashima, LP2 |
| Total launches | 9 |
| Success(es) | 7 |
| Failure | 2 |
| First flight | 7 March 2023 |
| Last flight | 10 August 2026 (most recent) |
| Carries passengers or cargo | |
| Boosters – SRB-3 | |
| No. boosters | 0, 2 or 4 |
| Height | 15 m (49 ft) |
| Diameter | 2.5 m (8 ft 2 in) |
| Gross mass | 76.2 t (168,000 lb) each |
| Propellant mass | 67.2 t (148,000 lb) each |
| Maximum thrust | 2,300 kN (520,000 lbf) each |
| Total thrust | 4,600 or 9,200 kN (1,000,000 or 2,100,000 lbf) |
| Specific impulse | 283.6 s (2.781 km/s) |
| Burn time | 110 seconds |
| First stage | |
| Height | 37 m (121 ft) |
| Gross mass | 241 t (531,000 lb) |
| Propellant mass | 226 t (498,000 lb) |
| Powered by | 2 or 3 × LE-9 |
| Maximum thrust | 2,942 or 4,413 kN (661,000 or 992,000 lbf) |
| Specific impulse | 425 s (4.17 km/s) |
| Burn time | 300 or 225 seconds |
| Propellant | LOX / LH2 |
| Second stage | |
| Height | 12 m (39 ft) |
| Gross mass | 28 t (62,000 lb) |
| Propellant mass | 24.6 t (54,000 lb) |
| Powered by | 1 × LE-5B-3 |
| Maximum thrust | 137 kN (31,000 lbf) |
| Specific impulse | 448 s (4.39 km/s) |
| Burn time | 699 seconds |
| Propellant | LOX / LH2 |
The H3 is a Japanese medium-lift launch vehicle developed by JAXA and Mitsubishi Heavy Industries (MHI). A hydrolox-fuelled rocket, it is the successor to the H-IIA and H-IIB launch vehicles. The H3 uses the LE-9 main engine, which was designed to be less expensive to produce as part of a broader effort to lower launch costs. The rocket has a modular design: its first stage is powered by two or three LE-9 engines and can be fitted with zero, two, or four SRB-3 solid rocket boosters, which are also used on the Epsilon S small-lift launch vehicle. The second stage uses the LE-5B-3 engine, an upgraded version of the engine family used since the H-I rocket.
Development of the H3 began in 2013. Its maiden flight in March 2023 failed after the second-stage engine did not ignite. The rocket's first successful flight took place in February 2024.
In addition to launching satellites into Earth orbit, the H3 is used to launch the HTV-X cargo spacecraft to the International Space Station and is planned to launch the Martian Moons eXploration and Lunar Polar Exploration Mission probes.