Greater Jakarta Integrated Mass Transit System
| Greater Jakarta Integrated Mass Transit System | |
|---|---|
Clockwise from top: Jakarta MRT, Jabodebek LRT, KRL Commuterline, Whoosh, Transjakarta, SHIA ARS, and Jakarta LRT | |
| Overview | |
| Native name | Sistem Angkutan Massal Terpadu Jabodetabek (Indonesian) |
| Locale | Greater Jakarta, Indonesia |
| Transit type | Rapid Transit, Commuter Rail, Light Rapid Transit, Airport Rail Link, High Speed Rail & Bus Rapid Transit |
Number of lines | 25 |
Number of stations | 428 |
Daily ridership | |
Annual ridership | |
| Website | www.jaklingkoindonesia.co.id |
| Operation | |
Began operation | 15 January 2004 |
| Operators |
|
| Technical | |
| System length | 672.4 km (418 mi) (exclude Whoosh) |
| Track gauge |
|
| Electrification | |
The Greater Jakarta Integrated Mass Transit System is an integrated transport network that primarily serves the area of Jakarta metropolitan area and surrounding areas. The system commenced operations in January 2004 with the introduction of Transjakarta, a bus rapid transit system. It was significantly improved in 2011 with the modernisation of commuter rail services on the existing rail between Jakarta and satellite cities. The system has since expanded and currently consists of 11 fully operating rail lines in a radial formation; five commuter rail lines, one airport rail link line to the Soekarno Hatta International Airport's (SHIA) Terminal 1, Terminal 2, and Terminal 3, four rapid transit lines, fourteen bus rapid transit line and one high speed rail line to Bandung. The system encompasses 654.5 kilometres (406.7 mi) of grade-separated railway with 371 operational stations. All of the systems were then integrated following the introduction of Jak Lingko in December 2017.