Jakarta MRT

Jakarta MRT
Ratangga set 3 arriving at Haji Nawi station
Ratangga set 3 arriving at Haji Nawi station
Overview
Native nameModa Raya Terpadu (MRT) Jakarta
OwnerProvincial Government of DKI Jakarta
directly and through Perumda Pasar Jaya
Area servedGreater Jakarta
LocaleJakarta, Indonesia
Transit typeRapid transit
Number of lines
1
Number of stations
13 (operational)
7 (under construction)
Daily ridership
176,929 (daily peak)
111,534 (2024 average)
Annual ridership
40.821 million (2024)
Chief executive
Tuhiyat, CEO
HeadquartersWisma Nusantara, 21st Floor, Jalan Mohammad Husni Thamrin 59, Jakarta, 10350, Indonesia
WebsiteMRT Jakarta
Operation
Began operation
24 March 2019 (2019-03-24)
OperatorPT Mass Rapid Transit Jakarta (Perseroda)
CharacterElevated & underground
Number of vehicles
16 six-car MRTJ 1000 series trainsets
Headway5 minutes (peak)
10 minutes (off-peak)
Technical
System length15.7 km (9.8 mi)
(operational)
30.3 km (18.8 mi) (under construction)
Track gauge1,067 mm (3 ft 6 in)
Electrification1,500 V DC overhead catenary
Top speed80 km/h (elevated section)
100 km/h (underground section)
System map

The Jakarta Mass Rapid Transit (Indonesian: Moda Raya Terpadu Jakarta) or Jakarta MRT (MRT Jakarta, stylized in all-lowercase) is a rapid transit system in Jakarta, the capital city of Indonesia.

The system is operated by PT Mass Rapid Transit Jakarta (Perseroda), a perseroan terbatas company owned by the Jakarta provincial government. Phase 1 of the project (Lebak Bulus to Bundaran HI) was officially opened on 24 March 2019.