Gaddi Godam Square metro station

Gaddi Godam Square
General information
LocationGaddigodam Chowk, Mohan Nagar, Nagpur, Maharashtra 440001
Coordinates21°09′41″N 79°05′01″E / 21.16150°N 79.08369°E / 21.16150; 79.08369
System
Nagpur Metro station
OwnerMaharashtra Metro Rail Corporation Limited (MAHA-METRO)
OperatorNagpur Metro
LineOrange Line
PlatformsSide platform
Platform-1 → Automative Square
Platform-2 → Khapri
Tracks2
Construction
Structure type
Elevated, Double track
Platform levels
2
AccessibleYes Disabled access
Other information
StatusOperational
History
Opening12 December 2022 (12 December 2022)
Electrified750 V DC third rail
Services
Preceding station Nagpur Metro Following station
Kadvi Square Orange Line Kasturchand Park
towards Khapri
Location

Gaddi Godam Square is an elevated metro station on the North-South Corridor of the Orange Line of Nagpur Metro in Nagpur, India. This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022.