Number of lines
BRT line 3: Shelved,
BRT line 7: Proposed
Number of stations
  • BRT line 3 northern section: 25 (shelved)
  • BRT line 3 southern section: 16 (planned)
Daily ridership
400,000 (estimated)
HeadquartersHouse 4, Road 21, Sector 4, Uttara, Dhaka
Websitedhakabrt.gov.bd
Operation
Began operation
  • BRT line 3 northern section: 15 December 2024 (without full facilities)
OperatorDhaka Bus Rapid Transit Company Limited
Number of vehicles
  • Current: 10 diesel-run BRTC AC buses
  • Planned: 137 diesel-run purpose built AC buses
Technical
System length41 km (25 mi)
Average speed23 km/h

The Dhaka BRT (Bengali: ঢাকা বিআরটি) or Dhaka Line (Bengali: ঢাকা লাইন) was an under-construction bus rapid transit system in Dhaka, Bangladesh.

The original plan for the network included two lines: BRT Line-3 and BRT Line-7. BRT Line-3 was shelved in 2025 due to expected traffic chaos as it neared completion, while the other route is still in the planning phase. The Bangladesh Road Transport Corporation operates a bus route on the incomplete BRT Line-3.