Docklands Light Railway B90, B92, and B2K Stock

B90, B92 and B2K stock
B92 stock at Shadwell in 2014
Interior
In service
  • B90: 1991–present
  • B92: 1993–present
  • B2K: 2001–present
ManufacturerBombardier Transportation
Built atBruges, Belgium
ReplacedP86
P89
Number built
  • B90: 23
  • B92: 47
  • B2K: 24
Number scrapped4 trains
SuccessorB23
Formation2/3 vehicles per train
Fleet numbers
  • B90: 22-44
  • B92: 45-91
  • B2K: 92-99, 01-16
Capacity(3-car train) 284 seated, 688 capacity
Depots
Line servedDocklands Light Railway
Specifications
Train length28 m (91 ft 10+3⁄8 in)
Width2.65 m (8 ft 8+3⁄8 in)
Height3.51 m (11 ft 6+1⁄4 in)
Doors4 pairs of doors each side per car, 1.5 m (4 ft 11 in) wide
Maximum speed
  • 80 km/h (50 mph) (Maximum speed capable)
  • 64 km/h (40 mph) (Regular operational speed)
Weight36 t (35 long tons)
Electric systems750 V DC third rail
Current collectionContact shoe bottom contact
Minimum turning radius38 m (125 ft)
Track gauge4 ft 8+1⁄2 in (1,435 mm) standard gauge
Notes/references

The Docklands Light Railway B90, B92, and B2K stock are the second generation of trains used on the Docklands Light Railway (DLR), a light metro system which serves the London Docklands area in the east of London.

Owing to various issues with the P86 and P89 trains originally used on the DLR (including non-compliance with fire safety standards required for underground operation, low capacity, inability to be coupled in pairs and issues with the signalling system), London Transport ordered a replacement fleet from La Brugeoise et Nivelles (later Bombardier Transportation) and a new signalling system from Alcatel SelTrac as part of the Beckton extension of the DLR in the early 1990s. A total of 94 trains were built in three batches between 1991 and 2002 at Bombardier's factory in Bruges, Belgium.

As with all DLR trains, the B90, B92, and B2K stock are highly automated, running segregated from traffic powered by a bottom-contact third rail. The automation system is a GoA3 driverless system, which requires a Passenger Service Agent (PSA) to manually open and close the doors and, when necessary, manually drive the train. The B90, B92, and B2K stock trains are cosmetically and technologically identical, and can be operated interchangeably in trains of up to three sets. The 'B' in the type codes refers to Beckton DLR depot, where they are primarily maintained.

In 2019, Transport for London (TfL) announced that they had ordered 43 trains from Construcciones y Auxiliar de Ferrocarriles (CAF) to replace the B90/B92/B2K vehicles. The B23 stock entered service in 2025, with the DLR timetable altered to maximise the life of the B90/B92/B2K trains before they are withdrawn from service.