Docklands Light Railway B23 Stock
| B23 Stock | |
|---|---|
B23 Stock at Pontoon Dock in 2025 | |
Interior | |
| In service | 2025–2025, 2026–present |
| Manufacturer | Construcciones y Auxiliar de Ferrocarriles (CAF) |
| Built at | Beasain, Spain |
| Family name | CAF Inneo |
| Replaced | B90/B92/B2K |
| Constructed | 2020–2026 |
| Number built | 54 |
| Formation | 5 cars per unit |
| Fleet numbers | 201-254 |
| Capacity | 156 seats, 792 capacity |
| Depot | Beckton DLR depot |
| Line served | Docklands Light Railway |
| Specifications | |
| Car body construction | aluminium monocoque |
| Train length | 86.7 m (284 ft 5+3⁄8 in) |
| Width | 2.65 m (8 ft 8+3⁄8 in) |
| Doors | 12 doors (two per side on Cars A, C & E, and three per side on Cars B & D) |
| Maximum speed |
|
| Weight | 117 t (115 long tons) |
| Electric systems | 750 V DC third rail |
| Current collection | Contact shoe bottom contact |
| Minimum turning radius | 125 ft (38 m) |
| Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge |
| Notes/references | |
The Docklands Light Railway B23 Stock is the fourth generation of train used on the Docklands Light Railway (DLR), a light metro system that serves the London Docklands area in the east of London.
In 2019, Transport for London (TfL) announced that they had ordered 43 trains from Construcciones y Auxiliar de Ferrocarriles (CAF) to replace the existing B90/B92/B2K stock and provide additional capacity on the network. An additional 11 trains were ordered in 2023. After delays in testing, the B23 Stock entered service in 2025, but was removed from service two months later due to braking issues. The B23 fleet returned to service in September 2026.
Unlike the older fleet (which operates two or three trains coupled together), the B23 Stock has fixed formation units with 5 walk-through coaches equivalent to the length of the existing three-car trains – increasing capacity by 10%. The B23 Stock features real-time digital information screens, air conditioning and mobile device charging points.
As with all DLR trains, the B23 Stock are highly automated, running segregated from traffic and powered by a bottom-contact third rail. The automation system is a GoA3 driverless system, which requires a Passenger Service Agent (PSA) to manually open and close the doors and, when necessary, manually drive the train. The 'B' in the type codes refers to Beckton DLR depot, where they are primarily maintained.