Circular line (Taipei metropolitan area)

Circular line
A C610 train leaving Shisizhang, on January 7, 2026
Overview
Other nameYellow line
Native name環狀線
Status
  • Phase 1: In service
  • South, North, East sections: Under construction
Owner
Line numberY
LocaleTaipei and New Taipei, Taiwan
Termini
Stations14 (Western section)
Color on mapYellow
Service
TypeLight metro
SystemTaipei Metro
OperatorNew Taipei Metro Corporation
Depots
  • North
  • South
Rolling stock
History
Planned opening
  • South and North sections: June 2031
  • East section: September 2032
Opened31 January 2020 (2020-01-31)
Technical
Line length15.4 km (9.6 mi)
Number of tracks2
CharacterElevated and underground
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification750 V DC third rail
Operating speed70 km/h (43 mph) to 80 km/h (50 mph)
Route map

Y01
Taipei Zoo
(Left arrow )
Y02
National Chengchi University
Y03
Wenshan District Office
Y04
Mamingtan
Y05
Gouzikou
Y06
Baodoucuo
(Left arrow  Right arrow)
Y07
Dapinglin
Y08
Shisizhang
Y09
Xiulang Bridge
Y10
Jingping
Y11
Jingan
(Left arrow  Right arrow)
Y12
Zhonghe
(Left arrow future  Right arrow)
Y13
Qiaohe
Y14
Zhongyuan
Y15
Banxin
Y16
Banqiao
(Left arrow  Right arrow)
(Left arrow Taiwan High Speed Rail Right arrow)
Y17
Xinpu Minsheng
Y18
Touqianzhuang
(Left arrow  Right arrow)
Y19
Xingfu
Y20
New Taipei Industrial Park
(Left arrow   Right arrow)
Y21
New Taipei City Exhibition Hall
Y22
Gengliao
Y23
Zhonglu
Y24
St Ignatius High School
(Left arrow  Right arrow)
Y25
Fenziwei
Y26
Chongyang Bridge
Y27
Shezi
Keelung River
Y28
Fudeyang
Y29
Shilin
(Left arrow  Right arrow)
Y30
Linzikou
Y31
National Palace Museum
Y32
Jiannan Road
(Up arrow  Right arrow)
Y33
Xiatayou
Y34
Zhouzi
Y35
Neihu Technology Park
Y36
Ruiguang Park
Y37
Fenliao
Y38
Jiulizu
Y39
Songshan
(Left arrow )
(Left arrow Taiwan High Speed Rail Right arrow)
(Up arrow  Right arrow)
Y40
Yongchun
(Up arrow  Right arrow)
Y41
Xiangshan
Y42
Sanzhangli
Note: Names in italics are only possible names and may change.
Circular line
Traditional Chinese環狀線
Simplified Chinese环状线
Transcriptions
Standard Mandarin
Hanyu PinyinHuánzhuàng Xiàn
Wade–GilesHuan2-chuang4 Hsien4
Tongyong PinyinHuánjhuàng-Siàn
Southern Min
Hokkien POJKhoân-chōng Sòaⁿ
Yellow line
Traditional Chinese黃線
Simplified Chinese黄线
Transcriptions
Standard Mandarin
Hanyu PinyinHuáng Xiàn
Wade–GilesHuang Hsien4
Tongyong PinyinHuáng-Siàn
Southern Min
Hokkien POJN̂g Sòaⁿ

The Circular line (Chinese: 環狀線; also known as Yellow line) is a medium-capacity rapid transit line on the Taipei Metro. The first section of this line is operated by New Taipei Metro Corporation and it runs between Dapinglin and New Taipei Industrial Park in the Taipei metropolitan area. It is approximately 15.4 km (9.6 mi) long with 14 stations. The initial western section was opened on 31 January 2020. Hitachi Rail Italy supplied 17 sets of 4-car driverless medium-capacity trains for the line. Extensions are currently underway to form a full loop.