Ankeng light rail

Ankeng light rail
Ankeng light rail trams near Ankang, on January 7, 2026
Overview
Native name安坑輕軌
StatusIn service
OwnerNew Taipei DORTS
Line numberK
LocaleXindian, New Taipei City, Taiwan
Termini
Stations9
Color on mapKhaki
Service
TypeLight rail
SystemNew Taipei Metro
OperatorNew Taipei Metro Co.
DepotAnkeng Depot
Rolling stockAnkeng LRV
History
Opened10 February 2023 (2023-02-10)
Technical
Line length7.67 km (4.77 mi)
Number of tracks2
CharacterGround level, elevated
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Route map

(Left arrow  Up arrow)
K9
Shisizhang
K8
Xinhe Elementary School
K7
Sunshine Sports Park
K6
Ankang
K5
Jinwen University of Science and Technology
K4
Cardinal Tien Hospital Ankang Branch
K3
Taipei Xiaocheng
K2
Rose China Town
K1
Shuangcheng
Ankeng Depot

The Ankeng light rail (Chinese: 安坑輕軌; pinyin: Ānkēng Qīngguǐ) (code K) is a light rail transit (LRT) line in Xindian District, New Taipei City, Taiwan, operated by New Taipei Metro. The route begins in Shuangcheng, terminating at Shisizhang where it links with the Circular line. The line is known in the New Taipei Metro system as the Khaki line, or line K. It opened on 10 February 2023 and began service the following day. The rolling stock for the line is produced in Taiwan.

The trams on the Ankeng light rail are a partial battery-powered tram service, with some parts - especially the road running areas - battery powered while the rest is via overhead line electrification catenary at 750V DC. The line uses trams from the Taiwan Rolling Stock Company, most likely the same type of trams used for the Danhai light rail.

Construction started around April 2016 on the road level part between Shuangcheng and Jinwen University of Science and Technology stations, with the first tracks laid in November 2018.

A depot is located just past Shuangcheng station, near Antai Road. The depot is built on (or on the side of) a mountain, with a single bore tunnel capable of two tracks inside going through the mountain to arrive at Shuangcheng station, The train yard construction site is visible on Google Maps.

As of September 2022, the line was 92.54% complete. As of December 2021, the elevated section was still under construction, although the Anxin bridge over the Xindian river was 98.13% completed. As of February 2022, the first trams had arrived and entered testing on the track.

On February 10, 2023, the Ankeng LRT officially started operations and passengers could ride for free during the first month.