This article is about the former Central Australia Railway, which was built between 1878 and 1929 and dismantled in 1981. For the current north–south railway lines, see Adelaide–Darwin railway line. For the former narrow gauge line between Darwin and Birdum, see North Australia Railway. For the Adelaide to Darwin passenger train, see The Ghan. For the heritage railway between Port Augusta and Quorn, see Pichi Richi Railway.
Central Australia Railway
Route and principal completion dates
Overview
Status
Partially closed and removed, remaining section used by the Pichi Richi Railway
The routes of the narrow-gauge Central Australia Railway (1878–1980) and the standard-gauge Marree line which replaced the southernmost third of the route (1957–2019).
Perspective view with the southern Flinders Ranges routes in the foreground. Political pressure mandated the difficult eastern alignment of the original route.
The former Central Australia Railway, which was built between 1878 and 1929 and dismantled in 1980, was a 1241km (771mi)1067 mm narrow gauge railway between Port Augusta and Alice Springs. A standard gauge line duplicated the southern section from Port Augusta to Maree in 1957 on a new nearby alignment. The entire Central Australia Railway was superseded in 1980 after the standard gauge Tarcoola–Alice Springs Railway was opened, using a new route up to 200km to the west. A small southern section of the original line between Port Augusta and Quorn has been preserved and is operated as the Pichi Richi Railway.
Hidden categories:
Articles with short description
Short description matches Wikidata
Use Australian English from October 2012
All Wikipedia articles written in Australian English
Use dmy dates from October 2020
Articles using infobox templates with no data rows