Birmingham New Street railway station

Birmingham New Street
National Rail Midland Metro
The east end of the station, with the newly rebuilt and refurbished building which opened in 2015
General information
LocationBirmingham, West Midlands
England
Coordinates52°28′41″N 1°53′56″W / 52.478°N 1.899°W / 52.478; -1.899
Grid referenceSP069866
ManagerNetwork Rail
Transit authority
Transport for West Midlands
Platforms13 (including 4C)
Other information
Station codeBHM
Fare zone1
ClassificationDfT category A
History
Original company
London & North Western Railway
Key dates
1 June 1854First opened
8 February 1885Extension opened
1964–1967Rebuilt
2010–2015Redeveloped
Passengers
2020/21Decrease 7.351 million
 Interchange Decrease 1.024 million
2021/22Increase 22.683 million
 Interchange Increase 3.509 million
2022/23Increase 30.726 million
 Interchange Increase 4.328 million
2023/24Increase 33.335 million
 Interchange Increase 5.107 million
2024/25Increase 36.624 million
 Interchange Increase 5.641 million
Location
Notes
Passenger statistics from the Office of Rail and Road

Birmingham New Street, also known as New Street station, is the largest and busiest of the three main railway stations in Birmingham city centre, England. It is a central hub of the British railway system. The station is a major destination for Avanti West Coast services from London Euston, Preston, Glasgow Central and Edinburgh Waverley, and West Midlands Trains services from Liverpool Lime Street and London Euston both via the West Coast Main Line. The CrossCountry network centres on New Street, as well as local and suburban services within the West Midlands; these include those on the Cross-City Line between Lichfield Trent Valley, Redditch and Bromsgrove, the Chase Line to Walsall and Rugeley Trent Valley, and the Camp Hill line to Kings Norton. The three-letter station code is BHM.

The station is named after New Street, which runs parallel to it, although the station has never had a direct entrance from New Street except via the Grand Central shopping centre. Historically, the main entrance was on Stephenson Street, just off New Street. As of 2022, the station has entrances on Stephenson Street, Smallbrook Queensway, Hill Street and Navigation Street.

New Street is the thirteenth busiest railway station in the UK and the busiest outside London, with 36.6 million passenger entries and exits between April 2024 and March 2025. It is also the busiest interchange station outside London, with over 5 million passengers changing trains there annually. In 2018, New Street had a passenger satisfaction rating of 92%, the third highest in the UK.

The original New Street station opened in 1854. At the time of its construction, the station had the largest single-span arched roof in the world. In the 1960s, the station was completely rebuilt. An enclosed station, with buildings over most of its span and passenger numbers more than twice those for which it was designed, the replacement was not popular with its users. A £550m redevelopment of the station named Gateway Plus opened in September 2015; it includes a new concourse, a new exterior facade and a new entrance on Stephenson Street.