Camp Hill line
| Camp Hill line | |||
|---|---|---|---|
A non-stop CrossCountry passenger service powers along the Camp Hill line to bypass the University branch | |||
| Overview | |||
| Status | Operational | ||
| Owner | Network Rail | ||
| Locale | Birmingham | ||
| Termini | |||
| Stations | 3 | ||
| Service | |||
| Type | Heavy rail | ||
| System | National Rail | ||
| Operator(s) | CrossCountry West Midlands Trains | ||
| Rolling stock | Class 170 "Turbostar" Class 172 "Turbostar" Class 196 "Civity" Class 220 "Voyager" Class 221 "Super Voyager" | ||
| History | |||
| Opened | 1840–41 | ||
| Technical | |||
| Number of tracks | 2 | ||
| Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge | ||
| |||
Camp Hill line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The Camp Hill line is a railway line in Birmingham between Kings Norton and Birmingham New Street. Its official ELR designation is the St Andrews Junction to Kings Norton line, as the line piggybacks the station approach of the Rugby–Birmingham–Stafford line (accessed via St Andrews Junction and Grand Junction) to enter Birmingham New Street.
The line was once the terminal approach of the Birmingham and Gloucester Railway to Curzon Street before it was incorporated into the Midland Railway and subsequently rerouted to the new Birmingham New Street terminus. The expansion of the Birmingham West Suburban Railway (and the concurrent conversion of New Street into a through station) resulted in its usurping of the line as the service's primary route. From this point the name ‘Camp Hill line’ was used, named after its original terminus.
Local passenger services on the line ended in the 1940s and the intermediate stations on the line were closed. From then on until 2026 it was used primarily by freight trains and some longer-distance passenger trains only.
In early March 2026, the date for the resumption of local passenger services was announced, and the line and stations officially reopened on 7 April 2026. The reopened line runs into Birmingham New Street station, but there are plans to construct new chords at Bordesley station to link the line to Birmingham Moor Street.