Artemis V
The logo of Artemis V | |
| Mission type | Crewed lunar landing |
|---|---|
| Operator | NASA |
| Website | nasa |
| Spacecraft properties | |
| Spacecraft | |
| Manufacturer |
|
| Start of mission | |
| Launch date | Late 2028 (planned) |
| Rocket | Space Launch System |
| Launch site | Kennedy, LC-39B |
| End of mission | |
| Landing site | Pacific Ocean (planned) |
| Moon lander | |
| Landing site | South polar region |
Artemis V is planned to be the fourth crewed mission and second lunar landing of the NASA-led Artemis program. The mission is expected to see the first efforts by NASA to begin building a permanent Moon base. As of March 2026, launch is scheduled for late 2028.
Originally, Artemis V was proposed as the program's third lunar landing mission, sending an Orion spacecraft with four astronauts to the now-cancelled Lunar Gateway space station, where they would install two elements before heading to the lunar surface.