Ares V

Ares V
Artist's impression of an Ares V during solid rocket booster separation
FunctionSuper heavy-lift launch vehicle
Country of originUnited States
Size
Height109 or 116 m (358 or 381 ft)
Diameter8.4 or 10 m (28 or 33 ft)
Mass3,700,000 kilograms (8,200,000 lb)
Stages2
Capacity
Payload to LEO
Mass188,000 kg (414,000 lb)
Payload to TLI
Mass60,600 or 71,100 kg (133,600 or 156,700 lb)
Launch history
StatusCanceled
Launch sitesKennedy, LC-39A (planned)
Total launches0
Boosters – five-segment SRB
No. boosters2
Height54 m (177 ft)
Diameter3.7 m (12 ft)
Gross mass730,000 kg (1,600,000 lb)
Maximum thrust
  • SL: 14.6 MN (3,280,000 lbf)
  • vac: 16 MN (3,600,000 lbf)
Total thrust
  • SL: 29.2 MN (6,560,000 lbf)
  • vac: 32 MN (7,200,000 lbf)
Specific impulse269 s (2.64 km/s)
Burn time126 seconds
PropellantAPCP (Al / AP / PBAN)
First stage
Empty mass140,000 kg (310,000 lb)
Gross mass1,914,000 kg (4,220,000 lb)
Powered by
Maximum thrust
  • 5 × RS-68: 15,685 kN (3,526,000 lbf)
  • 6 × RS-68: 18,822 kN (4,231,000 lbf)
  • 5 × RS-25: 11,395 kN (2,562,000 lbf)
PropellantLH2 / LOX
Second stage – Earth Departure Stage
Powered by1 or 2 × J-2X
PropellantLH2 / LOX

The Ares V (formerly known as the Cargo Launch Vehicle or CaLV) was the planned cargo launch component of the cancelled NASA Constellation program, which was to have replaced the Space Shuttle after its retirement in 2011. Ares V was also intended to carry supplies for a human presence on Mars. Ares V and the smaller Ares I were named after Ares, the Greek god of war.

The Ares V was to launch the Earth Departure Stage and Altair lunar lander for NASA's return to the Moon, which was planned for 2019. It would also have served as the principal launcher for missions beyond the Earth-Moon system, including the program's ultimate goal, a crewed mission to Mars. The uncrewed Ares V would complement the smaller and human-rated Ares I rocket for the launching of the 4–6 person Orion spacecraft. Both rockets, deemed safer than the then-current Space Shuttle, would have employed technologies developed for the Apollo program, the Shuttle program, and the Delta IV EELV program. However, the Constellation program, including Ares V and Ares I, was canceled in October 2010 by the NASA Authorization Act of 2010. In September 2011, NASA detailed the Space Launch System as its new vehicle for human exploration beyond Earth's orbit, while commercial space companies would provide low Earth orbit access for both cargo and astronauts.