American Dream (shopping mall)

American Dream
American Dream logo
Aerial imagery of the southeastern facade of the complex, as seen by drone over the Hackensack River during May 2026
LocationMeadowlands Sports Complex, East Rutherford, New Jersey, U.S.
Coordinates40°48′36″N 74°04′03″W / 40.81000°N 74.06750°W / 40.81000; -74.06750
Address1 American Dream Way, 07073
OpenedOctober 25, 2019 (2019-10-25) (Nickelodeon Universe and Ice Rink)
December 5, 2019 (2019-12-05) (Big Snow)
October 1, 2020 (2020-10-01) (DreamWorks Water Park, retail stores and dining)
September 17, 2021 (2021-09-17) (luxury wing)
Previous names
  • Meadowlands Mills (1994–2002)
  • Meadowlands Xanadu (2002–2010)
  • The Meadowlands (2010–2011)
  • American Dream Meadowlands (2011–2019)
Developer
ManagementAmeream, LLC (subsidiary of Triple Five Group)
OwnerTriple Five Group
Architect
  • Gensler
  • Adamson Architects, Inc.
  • GH+A Design Studios
  • RSM Design
Stores450+ (at peak)
6 (at peak)
Floor area3,000,000 square feet (280,000 m2) ranked 2nd
Floors3 (2 in Barneys New York, Primark and Zara)
ParkingParking lot and parking garage with 33,000 paid spaces (Free for 15–30 minutes only)
Public transit
Railway Train NJ Transit Meadowlands station
Railway Train NJ Transit Meadowlands Rail Line Bus transport NJ Transit 85, 355, 356, 703, 772
Websitewww.americandream.com
Building details
Interior view (February 2026)
General information
StatusOperational
Type
Construction started
September 29, 2004 (resumed May 2009, November 2013 and late June 2017)
Completed
2021
Design and construction
Main contractor

American Dream is a super-regional shopping mall and entertainment complex in the Meadowlands Sports Complex in East Rutherford, New Jersey, and is the second largest mall in the United States behind the Mall of America. Its four opening stages occurred on October 25, 2019; December 5, 2019; October 1, 2020; and September 17, 2021.

The project was first proposed in February 2003 by Mills Corporation as the Meadowlands Xanadu, with construction beginning in September 2004. The company's previous proposal on a separate site, Meadowlands Mills, was never developed due to legal oppositions regarding environmental concerns. In January 2007, the project was taken over by Colony Capital Acquisitions LLC after Mills started financially struggling and began an acquisition by Simon Property Group and Farallon Capital Management. In May 2009, construction stalled due to the bankruptcy of Lehman Brothers. Triple Five Group announced intent to take over the mall in May 2011, and on July 31, 2013, officially gained control of the mall and the surrounding site. Following a series of ownership changes, financing issues, construction delays, and legal challenges, construction stopped again in December 2016.

In late June 2017, construction had resumed, after new financing had been secured, though the project would suffer a series of "chronically delayed" opening dates. Among the attractions that opened in 2019 were the Nickelodeon Universe theme park in October and the Big Snow American Dream indoor ski slope in December. The DreamWorks Water Park, which was scheduled to open March 19, 2020, as well as the mall's retail shops and restaurants, were delayed by the COVID-19 pandemic, which forced the mall's temporary closure on March 8, 2020. Following Governor Phil Murphy's August 26 announcement that amusements could open with restrictions on September 1, Big Snow American Dream announced it would reopen on that date, while other amusements and the mall's first major retail outlets reopened on October 1, 2020. As of August 2024, the mall hosted approximately 450 retail tenants, although legal and financial challenges persist.