The Adelaide–Darwin rail corridor consists of the 2975-kilometre (1849-mile) long 1435mm (4ft8+1⁄2in) standard-gauge main line between the South Australian capital city of Adelaide and the Northern Territory capital of Darwin, and the lines immediately connected to it. Preceded by a number of other shorter railways, a transcontinental line through to Darwin was completed in 2004, when the final link from Alice Springs was opened. The line is used by interstate freight trains operated by Aurizon and by The Ghan passenger train operated by Journey Beyond.
The Adelaide–Darwin rail corridor, completed in 2004. Construction of the first of its five constituent lines started 87years earlier – and its predecessor 39years before that.
Hidden categories:
Articles with short description
Short description is different from Wikidata
Use dmy dates from January 2021
Use Australian English from January 2012
All Wikipedia articles written in Australian English