Yüksek Hızlı Tren

Yüksek Hızlı Tren
Overview
Service typeHigh-speed rail
StatusOperating
LocaleNorthwest, Central Anatolia
Predecessor
First service13 March 2009
Current operatorTCDD Taşımacılık
Former operatorTurkish State Railways
Ridership12.4 million (2024)
Route
TerminiAnkara
Istanbul or Karaman or Sivas
Distance travelled1,385 km (860.6 mi)
Average journey time1 hour, 50 minutes
Service frequency15x Daily (Ankara-Istanbul)
6x Westbound 3x Eastbound(Ankara-Eskisehir)
4x Daily (Ankara-Konya)
4x Daily (Istanbul-Konya)
2x Daily (Ankara-Karaman)
2x Daily (Ankara-Sivas)
1x Daily (Istanbul-Karaman
1x Daily (Istanbul-Sivas)
On-board services
ClassesFirst, business and economy class
Disabled accessFully accessible
Catering facilitiesOn-board café, and at-seat meals (depending on the route)
Entertainment facilitiesOn-board television with feature films
Baggage facilitiesChecked baggage available at selected stations
Technical
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification25 kV 50 Hz AC
Operating speed300 km/h (186 mph) maximum
Track ownerTurkish State Railways
A TCDD HT65000 at the ATG terminal in Ankara
A TCDD HT80000 at the ATG terminal in Ankara

Yüksek Hızlı Tren or YHT (English: High Speed Train), operated by TCDD Transport, is the high-speed rail service in Turkey. Branded as "YHT", they are TCDD Transport's flagship passenger train service and the only high-speed rail service in the country. As of 2025, the network spans 1,385 km (860.6 mi) and serves major cities like Istanbul, Ankara, Eskişehir, İzmit, Konya, and Sivas. Expansion of the system is underway and the network is expected to reach Edirne, Afyonkarahisar, Adana, and İzmir in the 2020s.

High-speed rail in Turkey was originally planned to be built as early as 1975, but it wasn't until 2003 that the construction of the Ankara-Istanbul high-speed railway began. On 13 March 2009, the first phase of the high-speed railway, Ankara–Istanbul line, entered service between Ankara and Eskişehir. On 25 July 2014, the Ankara-Istanbul high-speed railway services began to reach the Pendik railway station on the Asian side of Istanbul, and on 13 March 2019 the services began to reach the Halkalı railway station on the European side of Istanbul, passing through the Marmaray railway tunnel under the Bosphorus strait. There were initially 6 daily departures in both directions.

It has two types of EMU train models operating at speeds of up to 250 km/h (155 mph) (HT65000) or 300 km/h (186 mph) (HT80000).

On 13 March 2009, the first phase of the high-speed railway, Ankara–Istanbul line, entered service between Ankara and Eskişehir. On 25 July 2014, the Ankara-Istanbul high-speed railway services began to reach the Pendik railway station on the Asian side of Istanbul, and on 13 March 2019 the services began to reach the Halkalı railway station on the European side of Istanbul, passing through the Marmaray railway tunnel under the Bosphorus strait. There were initially 6 daily departures in both directions.

As of 2026, the current length of the high-speed service stands at 1300km and another 1560km under construction, reaching 11 cities with 15 more cities on the line. All lines are compliant with ETCS Level 2 while some lines additionally retain Level 1 for legacy support. Being the 6th longest network in the world, high speed trains have carried over 100 million passengers and nearly 100 million kilometers since 2009. The 2053 Strategic Plan of the Ministry of Transport and Infrastructure envisions a 6.196km of high-speed rail, connecting 52 cities with locally manufactured trainsets and signalization solutions.