World Trade Centre Abuja
| The World Trade Centre | |
|---|---|
Rendition of the complex | |
Interactive map of the The World Trade Centre area | |
General information | |
| Status | Topped-out; under construction; Proposed |
| Type |
|
Architectural style | High-Tech |
| Location | Plot 1113, Constitution Avenue, Central Business District, Abuja, FCT |
| Coordinates | 9°02′56″N 7°28′24″E / 9.0489988°N 7.4733539°E |
Construction started |
|
Completed |
|
| Opened | 8 December 2023 |
| Cost | NG₦152 billion (~US$1 billion) |
| Height | |
| Roof |
|
| Technical details | |
| Material | glass, steel, aluminum, concrete reinforced |
| Floor count |
|
| Design and construction | |
| Architect | Woods Bagot |
| Developer | First Intercontinental Properties Limited |
| Main contractor |
|
| Website | |
| wtcabuja.com/ | |
The World Trade Centre is a complex of eight buildings under construction in the Central Business District of Abuja, FCT in Nigeria. There are seven skyscrapers planned for the site, two of which have already been topped out, with the others either under construction or at various stages of development. At 110 m (361 ft), the 24-floor WTC Tower 1, which topped out in 2015 was briefly the tallest residential building in Nigeria, while WTC Tower 2 is the tallest building in Abuja, standing at 120 m (394 ft). Initially scheduled to be opened in 2013, the World Trade Centre Abuja is now scheduled to open in 2016.
The complex is being funded by private financial institutions, as well as private investors, costing about ₦200 billion. it is being developed by First Intercontinental Properties Limited, a subsidiary of The churchgate Group, a Nigerian real estate company, and the project was designed by Woods Bagot, WSP Consulting is the structural consultant, whilst Abuja Investments Company is also a partner. The WTC Abuja, when completed, will be the largest mixed-use development on the West African subcontinent.