Woodsmith Mine Tunnel

Woodsmith Mine Tunnel
Image of a construction site surrounded by moorland
Lockwood Beck site
Interactive map of Woodsmith Mine Tunnel
Overview
Official nameMineral Transport System (MTS)
LocationNorth Yorkshire
Coordinates54°29′39″N 0°54′01″W / 54.4942°N 0.9002°W / 54.4942; -0.9002
StatusUnder construction
Crosses
StartWoodsmith Mine
(Sneatonthorpe)
(54°26′06″N 0°37′18″W / 54.4350°N 0.6216°W / 54.4350; -0.6216 (Woodsmith Mine Portal))
EndWilton
(54°35′47″N 1°06′07″W / 54.59645°N 1.10203°W / 54.59645; -1.10203 (Wilton Portal))
Operation
Work beganApril 2019
Constructed2019–
Opens2030
OwnerAnglo American PLC
TrafficPolyhalite
CharacterMineral transport
Technical
Design engineerStrabag
Length23 miles (37 km)
No. of tracks1 (Maintenance train)
Operating speed
13 miles per hour (21 km/h)
Max elevation390 feet (120 m)
Min elevation1,180 feet (360 m)
Tunnel clearance
20 feet (6 m)
Width20 feet (6 m)

The Woodsmith Mine Tunnel (also known as a Mineral Transport System [MTS]) is a 23-mile (37 km) long tunnel that will stretch between Woodsmith Mine at Sneatonthorpe near Whitby in North Yorkshire and the Wilton International complex on Teesside, England. The tunnel has been in development since 2016, but cutting of the tunnel bore did not start until April 2019, with an original projected completion date of 2021, now projected to 2030. By December 2025 tunnelling had advanced 19 miles (30 km), 81% complete.

When finished, the tunnel will be the longest tunnel in the United Kingdom and will also house the longest conveyor in the UK. The estimated cost of the tunnel in November 2018 was £1.1 billion.