Virginia-class submarine
Virginia-class SSN profile | |
USS Virginia underway in July 2004 | |
| Class overview | |
|---|---|
| Builders | |
| Operators |
|
| Preceded by |
|
| Succeeded by | SSN(X) class |
| Cost | $2.8 billion per unit (2019); $4.3 billion per unit w/VPM (2023) |
| Built | 2000–present |
| In commission | 2004–present |
| Planned |
|
| On order |
|
| Building |
|
| Completed |
|
| Canceled | 0 |
| Active |
|
| General characteristics | |
| Type | Nuclear-powered attack submarine (SSN) |
| Displacement |
|
| Length |
|
| Beam | 34 ft (10 m) |
| Propulsion | |
| Speed | 25 knots (46 km/h; 29 mph) or over |
| Range | Unlimited |
| Endurance | Only limited by food and maintenance requirements. |
| Test depth | Over 800 ft (240 m) |
| Complement | 135 (15 officers; 120 enlisted) |
| Armament |
|
The Virginia class, or the SSN-774 class, is a class of nuclear-powered attack submarines with vertical launching system-launched cruise missile capability in service with the United States Navy. The class is designed for a broad spectrum of open-ocean and littoral missions, including antisubmarine warfare and intelligence-gathering operations. They are scheduled to replace older Los Angeles-class attack submarines, many of which have already been decommissioned, as well as four cruise missile submarine variants of the Ohio-class submarines. Upon the 25 July 2025 decommissioning of the Los Angeles-class submarine USS Helena (SSN-725), the Virginia class became the most numerous active submarine class in the world.
The Virginia class is built through an industrial arrangement designed to maintain both General Dynamics Electric Boat and Newport News Shipbuilding, the only two U.S. shipyards capable of building nuclear-powered submarines. Under the present arrangement, the Newport News facility builds the stern, habitability, machinery spaces, torpedo room, sail, and bow, while Electric Boat builds the engine room and control room. The facilities alternate work on the reactor plant, as well as the final assembly, test, outfit, and delivery.
Virginia-class submarines will be acquired through 2043, and are expected to remain in service until at least 2060, with later submarines expected to operate into the 2070s.
On 14 March 2023, the trilateral Australian-British-American security pact known as AUKUS announced that the Royal Australian Navy would purchase three Virginia-class submarines as a stopgap measure between the retirement of their conventionally powered Collins-class submarines and the acquisition of the future SSN-AUKUS-class submarines. If SSN-AUKUS falls behind schedule, Australia will have the option of purchasing two additional Virginia-class submarines.