Valley Metro Rail & Streetcar

Valley Metro Rail & Streetcar
A Line train and S Line streetcar at Dorsey/Apache Boulevard station
Overview
OwnerValley Metro
LocaleValley of the Sun Metroplex
Transit type
Number of lines
3
Number of stations
Daily ridership
33,700 (weekdays, Q2 2026)
Annual ridership
11,100,300 (2025)
Websitewww.valleymetro.org/rail
Operation
Began operation
December 27, 2008 (2008-12-27)
OperatorsAlternate Concepts, Inc.
CharacterAt-grade, elevated
Rolling stock
Headway12–20 minutes (A Line, B Line)
15–20 minutes (S Line)
Technical
System length38 mi (61 km)
No. of tracks2
Track gauge4 ft 8+1⁄2 in (1,435 mm) standard gauge
ElectrificationOverhead line, 750 V DC
System map
Valley Metro Rail & Streetcar systems highlighted
  A Line
  B Line
  S Line
Light rail
 Metro Parkway 
Parking
Mountain View/25th Avenue
25th Avenue/Dunlap
19th Avenue/Dunlap
Parking
Northern/19th Avenue
Glendale/19th Avenue
Montebello/19th Avenue
Parking
19th Avenue/Camelback
Parking
7th Avenue/Camelback
Parking
Central Avenue/Camelback
Parking
Campbell/Central Avenue
Indian School/Central Avenue
Osborn/Central Avenue
Thomas/Central Avenue
Encanto/Central Avenue
McDowell/Central Avenue
Roosevelt/Central Avenue
McKinley Loop
Van Buren/
1st Avenue
|
Van Buren/
Central Avenue
Washington/Central Avenue
3rd Street Loop
 Downtown Phoenix Hub 
Lincoln/
1st Avenue
|
Lincoln/
Central Avenue
3rd Street/
Jefferson
|
3rd Street/
Washington
5th Street Loop
Sherman Loop
12th Street/
Jefferson
|
12th Street/
Washington
Buckeye/Central Avenue
24th Street/
Jefferson
|
24th Street/
Washington
Pioneer/Central Avenue
38th Street/Washington
Parking
Broadway/Central Avenue
44th Street/Washington enlarge…
Phoenix Sky Harbor International Airport
Roeser/Central Avenue
Southern/Central Avenue
50th Street/Washington
Parking
 Baseline/Central Avenue 
Operations and Maintenance Center
Priest Drive/Washington
Center Parkway/Washington
to Marina Heights/Rio Salado Parkway
Mill Avenue/3rd Street
Veterans Way/College Avenue
University Drive/Rural
Dorsey/Apache Boulevard
Parking
McClintock/Apache Boulevard
Parking
Smith–Martin/Apache Boulevard
Price–101 Freeway/Apache Boulevard
Parking
Sycamore/Main Street
Parking
Alma School/Main Street
Country Club/Main Street
Center/Main Street
Mesa Drive/Main Street
Parking
Stapley/Main Street
 Gilbert Road/Main Street 
Parking
Streetcar
 Marina Heights/Rio Salado Pky 
Hayden Ferry/Rio Salado Pky
Tempe Beach Park/Rio Salado Pky
3rd St/Ash Av | 3rd St/Mill Av
5th St/Ash Av | 6th St/Mill Av
University Dr/Ash Av
9th St/Mill Av
11th St/Mill Av
College Av/Apache Bvd
Paseo del Saber/Apache Bvd
Rural/Apache Bvd
 Dorsey/Apache Bvd 
Parking
Key
A Line
B Line
S Line

Handicapped/disabled access All stations are accessible

Valley Metro Rail & Streetcar is a 35-mile (56 km) light rail and 3-mile (5 km) streetcar system serving the Valley of the sun Metroplex in Arizona, United States. The network, part of the Valley Metro system, comprises three lines: the east–west A Line between Phoenix and Mesa; the north–south B Line entirely within Phoenix; and the S Line streetcar in Tempe. The light rail lines have 54 total stations, while the streetcar serves 14 stations. In 2025, the system had a ridership of 11,100,300, or about 33,700 per weekday as of the second quarter of 2026.

The light rail system is primarily at-grade with an exclusive lane and some elevated sections, while the streetcar portions are in shared traffic. The first section was funded by a 2000 sales tax across Maricopa County and opened on December 27, 2008, with 32 stations in Phoenix and Mesa. Valley Metro Rail & Streetcar has been expanded seven times since the first section opened, with projects ranging from a single infill station to a eight stations on the South Central Extension in 2025. The S Line in Tempe opened in 2022 and uses a separate rolling stock from the rest of the system. Extensions of the system, made possible by Prop 104 and funded by Prop 479, include an extension of the S Line into Mesa planned to open this decade, and a new line into West Phoenix is planned to open in 2037 while other projects are in planning or suspended.