Uvac, Rudo

Uvac
Увац
Village
Uvac is located in Bosnia and Herzegovina
Uvac
Uvac
Location within Bosnia and Herzegovina
Coordinates: 43°36′0″N 19°29′10″E / 43.60000°N 19.48611°E / 43.60000; 19.48611
Country Bosnia and Herzegovina
Entity Republika Srpska
MunicipalityRudo
Time zoneUTC+1 (CET)
 • Summer (DST)UTC+2 (CEST)
Preview warning: Page using Template:Infobox settlement with deprecated parameter settlement_type. Replace with type.
Preview warning: Page using Template:Infobox settlement with deprecated parameter timezone. Replace with time_zone.
Preview warning: Page using Template:Infobox settlement with deprecated parameter blank_info. Replace with custom_data_sec1.
Preview warning: Page using Template:Infobox settlement with deprecated parameter pushpin_mapsize. Replace with pushpin_map_size.
Preview warning: Page using Template:Infobox settlement with deprecated parameter blank_name. Replace with custom_label_sec1.
Preview warning: Page using Template:Infobox settlement with deprecated parameter pushpin_map_caption. Replace with pushpin_caption.
Preview warning: Page using Template:Infobox settlement with deprecated parameter imagesize. Replace with image_size.
Preview warning: Page using Template:Infobox settlement with deprecated parameter image_caption. Replace with caption.
Preview warning: Page using Template:Infobox settlement with deprecated parameter timezone_DST. Replace with time_zone_DST.
Preview warning: Page using Template:Infobox settlement with multiple other deprecated parameters. Fix those above and preview again.
Uvac train station in 1906

Uvac (Serbian Cyrillic: Увац) is a village in the municipality of Rudo, Republic of Srpska, Bosnia and Herzegovina. It is on the border between Serbia and Republic of Srpska. Uvac was one of the two end stations of the Bosnian Eastern Railway, which had been built from Sarajevo to Uvac and Vardište during the Austro-Hungarian rule in Bosnia and Herzegovina. Construction of the line started in 1903. It was completed in 1906, using the 760 mm (2 ft 5+15⁄16 in) track gauge. With the cost of 75 million gold crowns, which approximately translates to 450 thousand gold crowns per kilometer, it was one of the most expensive railways in the world built by that time. The extension to Priboj was built in 1928, and opened for traffic on 1 January 1929. The line was closed down in 1978, and dismantled afterwards.