Upper Trishuli 3A Hydropower Station
| Upper Trishuli 3A Hydropower Station | |
|---|---|
Upper Trishuli 3A Hydropower Station Location within Nepal | |
| Official name | Upper Trishuli 3A Hydropower Project |
| Country | Nepal |
| Location | Rasuwa District |
| Coordinates | 28°1′21″N 85°12′38″E / 28.02250°N 85.21056°E |
| Purpose | Power |
| Status | Non-operational |
| Owner | Mai Valley Hydropower P Ltd. |
| Dam and spillways | |
| Type of dam | Gravity |
| Impounds | Trisuli River |
| Power Station | |
| Operator | NEA |
| Commission date | 30 August 2019 |
| Type | Run-of-the-river |
| Installed capacity | 60 MW |
Upper Trishuli 3A Hydropower Station (Nepali: माथिल्लो त्रिशुली ३a जलविद्युत आयोजना) is a run-of-river hydroelectric plant located in Rasuwa District of Nepal. The flow from the Trishuli River was used to generate 60 MW of electricity, but the plant has since been severely impacted by the 2026 Nepal floods.