Upper Trishuli 1 Hydroelectric Project
| Upper Trishuli-1 Hydroelectric Project | |
|---|---|
| Location | Rasuwa District, Nepal |
| Status | Under construction |
| Owners | Nepal Water and Energy Development Company |
| Dam and spillways | |
| Type of dam | Diversion dam |
| Height | 29.5 m |
| Length | 100.9 m |
| Power Station | |
| Type | Run-of-the-river |
| Turbines | 3 × 72 MW |
| Installed capacity | 216 MW |
The Upper Trishuli-1 Hydroelectric Project (UT-1) is a 216 MW run-of-the-river hydroelectric project under construction on the Trishuli River in Rasuwa District, Nepal. The project is being developed by Nepal Water and Energy Development Company Private Limited (NWEDC), and the electricity generated is intended for domestic consumption through the Nepal Electricity Authority (NEA).