Upper Appomattox canal system
| Upper Appomattox Canal Navigation System | |
|---|---|
The Abutment Dam, the Appomattox Canal Dam, brought water to the Upper Appomattox Canal. | |
| Specifications | |
Maximum boat beam | 5 ft 0 in (1.52 m) |
| Locks | 17 Locks (Staircase fashion around the Fall Line and along the river) |
| Status | No longer in use since 1890 |
Navigation authority | Virginia General Assembly |
| History | |
| Original owner | Upper Appomattox Canal company |
Principal engineer | John Couty (1830) |
| Date of act | 1796 |
| Construction began | 1809 |
| Date completed | 1816 |
| Date closed | 1890 |
| Geography | |
| Start point | Farmville, Virginia |
| End point | Petersburg, Virginia |
| Branch | Appomattox River |
| Branch of | James River |
From 1745 to 1891, the Upper Appomattox Canal Navigation system enabled farmers to deliver wheat and corn to mills on the Appomattox River as far west as Farmville, Virginia, then to ship milled flour to Petersburg. The canal, which circumvented the falls at Petersburg, had a turning basin that let the long, narrow bateau reverse direction, unload shipments, and load goods for the return trip. The system thus served downstream markets destined for the Chesapeake Bay markets and upstream markets from the coastal plain. Canal boats also carried passengers in relative speed and comfort.