Unity Tower
| Unity Tower | |
|---|---|
Unity Tower (2026) | |
Unity Tower Location within Poland | |
General information | |
| Status | Completed |
| Type | Headquarters of the Main Technical Organization |
| Location | 16-24 Lubomirskiego Street, Kraków, Poland |
| Coordinates | 50°04′05″N 19°57′28″E / 50.06806°N 19.95778°E |
Construction started | 1975–1979 (original) 30 March 2016 |
Completed | June 2019 |
| Owner | TreiMorfa |
| Height | |
| Roof | 102.5 m (336 ft) |
| Technical details | |
| Floor count | 27 |
| Design and construction | |
| Architects | Zdzisław Arct, Ewa Dworzak, Ludwik Konior and Krzysztof Leśnodorski (original) |
Architecture firm | DDJM Biuro Architektoniczne (rebuild) |
| Main contractor | Mostostal (original) Strabag (rebuild) |
| Website | |
| www | |
Unity Tower (commonly nicknamed the Skeletor (Polish: Szkieletor [ʂkʲɛˈlɛtɔr]) prior to completion) is a 102.5 metre high-rise building located in Kraków, Poland. Unity Tower is located near the Mogilskie Roundabout (Rondo Mogilskie) and Kraków University of Economics. It is the second-tallest building in Kraków after K1.
Due to the skeletal appearance of the unfinished building from 1970s to 2010s; the building gained the unofficial nickname Skeletor. The construction finally resumed in 2016 and the construction work of Unity Centre was completed on 30 September 2020.