USS Doris Miller
Sister ship John F. Kennedy | |
| History | |
|---|---|
| Name | Doris Miller |
| Namesake | Doris Miller |
| Awarded | 31 January 2019 |
| Builder | Newport News Shipbuilding |
| Laid down | 2026 (expected) |
| Launched | October 2029 (planned) |
| Sponsored by |
|
| Commissioned | 2034 (planned) |
| Identification | CVN-81 |
| Status | Under construction |
| General characteristics | |
| Class & type | Gerald R. Ford-class aircraft carrier |
| Displacement | About 100,000 long tons (100,000 tonnes) (full load) |
| Length | 1,106 ft (337 m) |
| Beam | 134 ft (41 m) |
| Draft | 39 ft (12 m) |
| Installed power | Two A1B nuclear reactors |
| Propulsion | Four shafts |
| Speed | In excess of 30 knots (56 km/h; 35 mph) |
| Range | Unlimited distance; 20–25 years |
| Complement | 4,660 |
| Armament | |
| Aircraft carried | 80 to 90 combat aircraft |
| Aviation facilities | 1,092 ft × 256 ft (333 m × 78 m) flight deck |
USS Doris Miller (CVN-81) is planned to be the fourth Gerald R. Ford-class aircraft carrier of the United States Navy. Doris Miller is expected to be laid down in 2026, and commissioned in February 2034. She will be built at Newport News Shipbuilding, a division of Huntington Ingalls Industries (formerly Northrop Grumman Shipbuilding) in Newport News, Virginia.