Type 45 destroyer

HMS Daring departing Portsmouth Naval Base, 1 March 2010
Class overview
NameType 45 destroyer
BuildersBAE Systems Maritime – Naval Ships
Operators Royal Navy
Preceded byType 42
Succeeded byType 83 (on hold)
CostOver £1.050 billion per ship incl. research, development and weapons, £650 million per ship excl. R&D
Built2003–2012
Planned12 (2000), 8 (2004), 6 (ordered)
Completed6
Active6
General characteristics
TypeGuided-missile destroyer
Displacement7,350 to 8,500 tonnes (8,400 long tons; 9,400 short tons)
Length152.4 m (500 ft)
Beam21.2 m (69 ft 7 in)
Draught7.4 m (24 ft 3 in)
Installed power
Propulsion
SpeedIn excess of 32 kn (59 km/h; 37 mph)
RangeIn excess of 7,000 nautical miles (13,000 km; 8,000 mi) at 18 kn (33 km/h; 21 mph)
Complement191 (accommodation for up to 285)
Sensors &
processing systems
Electronic warfare
& decoys
  • UAT Mod 2.0 (2.1 planned)
  • AN/SSQ-130 Ship Signal Exploitation Equipment (SSEE) Increment F cryptologic exploitation system
  • Seagnat (to be replaced by SEA Ancilia decoy launcher system under contract awarded in 2024)
  • Naval Decoy IDS300
  • Surface Ship Torpedo Defence
Armament
ArmourKevlar splinter protection, 70 mm magazine/VLS
Aircraft carried
  • 1 or 2 × Wildcat HMA2, armed with:
    • 4 × Sea Venom anti-ship missiles (initial operating capability from October 2025; full operating capability projected from 2026), or
    • 2 × Sting Ray anti-submarine torpedoes, or
    • 20 × Martlet multirole missiles (from 2021)
    • Mk 11 depth charges
  • or
  • 1 × Merlin HM2, armed with:
Aviation facilities

The Type 45 destroyer, also known as the D or Daring class, is a class of six guided-missile destroyers built for the United Kingdom's Royal Navy in the early 21st century. The class is primarily designed for anti-aircraft and anti-missile warfare and is built around the PAAMS (Sea Viper) air-defence system using the SAMPSON Active electronically scanned array (AESA) and the S1850M long-range radars. The first three destroyers were assembled by BAE Systems Surface Fleet Solutions from partially prefabricated "blocks" built at different shipyards; the remaining three were built by BAE Systems Maritime – Naval Ships. The first ship in the Daring class, HMS Daring, was launched on 1 February 2006 and commissioned on 23 July 2009. It is the last destroyer class made for the Royal Navy.

The Type 45 destroyers were built to replace the Type 42 (Sheffield-class) destroyers that had served during the Falklands War, with the last Type 42 being decommissioned in 2013. The National Audit Office reported that, during an "intensive attack", a single Type 45 could simultaneously track, engage and destroy more targets than five Type 42 destroyers operating together. After the launch of Daring on 1 February 2006, Admiral Sir Alan West, then First Sea Lord, stated that it would be the Royal Navy's most capable destroyer ever, as well as the world's best air-defence ship. The reduction in the number to be procured from twelve, then to (up to) eight, finally with only six confirmed (in 2008) was controversial.

In 2016, it was revealed that due to a design flaw on the Northrop Grumman intercooler attached to the Rolls-Royce WR-21 gas turbines, power availability was diminished considerably when functioning in the warm climate of the Persian Gulf, and it quickly became apparent that the class was not operating as originally envisioned. Therefore, a planned refit was scheduled from 2019 to 2021 to fully resolve the problems with the six ships in the class.

Under the previous plans, the Type 45 destroyer were planned to be replaced by the Type 83 destroyer, the first of which was expected to enter service in the late 2030s.