Tsawwassen Mills
Interior view (October 2016) | |
| Location | Delta, British Columbia, Canada |
|---|---|
| Coordinates | 49°02′17″N 123°05′10″W / 49.0381°N 123.0860°W |
| Address | 5000 Canoe Pass Way, V4M 0B3 |
| Opened | October 5, 2016 |
| Developer | Ivanhoé Cambridge |
| Management | Central Walk |
| Owner | Ruby Liu (Central Walk) |
| Architect |
|
| Stores | 200+ (at peak) |
| 13 (at peak) | |
| Floor area | 110,000 square metres (1,200,000 sq ft) |
| Floors | 1 |
| Parking | Parking lot with 6,000 free spaces (75 handicap, 14 EV and 22 Modo/Evo) |
| Website | www www |
Building details | |
Nature Neighbourhood 2 in October 2016 | |
General information | |
| Status | Operational |
Construction started | January 2014 |
Completed | 2016 |
| Design and construction | |
| Main contractor | Ledcor Construction |
Tsawwassen Mills (English: /təˈwɑːsən/ ⓘ tə-WAH-sən) is a super-regional outlet centre on Tsawwassen First Nation land, in Delta, British Columbia. The mall was developed by Ivanhoé Cambridge and opened on October 5, 2016. It features 110,000 square metres (1,200,000 sq ft) of retail space and a ≈1,100-seat food hall.
Despite the term "Mills" in the mall's name, alongside featuring a single-story themed layout, Mills Corporation and Simon Property Group were never involved with the mall's development or operations. Ivanhoé Cambridge purely designed the shopping centre this way as an inspiration. As of May 2022, the mall has been owned and operated by Ruby Liu of Central Walk.