Trinity Islands, Manchester
| Trinity Island | |
|---|---|
Vista River Gardens (left) and Trinity Heights (right) under construction, January 2025 | |
Location within Greater Manchester | |
| Former names | Trinity Islands |
General information | |
| Status | Trinity Heights: topped out Vista River Gardens: completed |
| Type | Residential |
| Location | Water Street, Manchester, England |
Construction started | 2022 (Vista River Gardens and Trinity Heights) |
Estimated completion | 2026 (Vista River Gardens) 2026 (Trinity Heights) |
| Cost | £741 million |
| Owner | Starlight Investments (Trinity Heights) |
| Height | |
| Roof | Trinity Heights: 183 m (600 ft) Vista River Gardens: 169 m (555 ft) |
| Technical details | |
| Floor count | Trinity Heights: 60 Vista River Gardens: 55 |
| Design and construction | |
| Architect | SimpsonHaugh |
| Developer | Renaker |
Structural engineer | WSP |
| Other information | |
| Number of units | 1,016 |
Trinity Island (formerly part of the wider Trinity Islands scheme) is a residential skyscraper cluster under construction in Manchester, England. The original proposal comprised four towers across two sites collectively known as Trinity Islands; the first site is now the singular Trinity Island, while the second has been rebranded as St John's Waterside. Trinity Island consists of two towers between 55 and 60 storeys: Trinity Heights at 183 metres (600 ft) and Vista River Gardens at 169 m (555 ft). Designed by SimpsonHaugh, the development includes 1,016 apartments with a total build cost of £741 million. The second site, St John's Waterside, also comprises two towers, with construction of the first, West Gate, beginning in May 2026.
In January 2026, the 60‑storey Trinity Heights topped out and became the second-tallest building in Greater Manchester, overtaking both Vista River Gardens and Beetham Tower.