Transpennine Route Upgrade

Transpennine Route Upgrade
Overview
StatusUnder construction
OwnerNetwork Rail
LocaleNorthern England
Termini
Stations23
Websitehttps://thetrupgrade.co.uk/
Service
SystemNational Rail
Operators
History
Work began2015
Planned opening2036–2041
Technical
Line length122 km (76 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Loading gaugeW12
Electrification25 kV 50 Hz AC overhead line
SignallingETCS Level 2

The Transpennine Route Upgrade (TRU) is a major project to upgrade the railway between Manchester and York via Huddersfield and Leeds in the north of England. The 76-mile (122 km) railway over the Pennines, consisting mostly of the Huddersfield line, is heavily used but is slow and lacks capacity. It has Victorian infrastructure, traverses difficult terrain including the 3-mile (4.8 km) Standedge Tunnel, and lacks electrification. The TRU aims to increase capacity by adding extra track, electrifying the entire route, introducing digital signalling, and upgrading stations.

The £11.5 billion programme consists of a succession of sub-projects designed to give incremental benefits to rail users over a period of time, with an anticipated overall completion date of between 2036 and 2041. Following completion of the upgrade trains will be able to run at top speeds of 125 mph (200 km/h). The number of fast trains between Manchester and Leeds is to increase from two to up to six per hour, and journey times will be reduced from 50 to 42 minutes. Freight capacity will also increase.