Tramlink

Tramlink
Variobahn (left) and CR4000 (right) trams at Sandilands tram stop
Variobahn (left) and CR4000 (right) trams at Sandilands tram stop
System diagram
System diagram
Overview
OwnerTransport for London
Area servedLondon Boroughs of
LocaleSouth London
Transit typeLight rail using trams
Number of stations
39
Annual ridership
17.2 million (2024–25) Decrease 14%
Websitewww.tfl.gov.uk/modes/trams/ Edit this at Wikidata
Operation
Began operation
10 May 2000 (2000-05-10)
OperatorTram Operations Ltd (FirstGroup)
Number of vehicles
Technical
System length28 km (17 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
ElectrificationOverhead line, 750 V DC
Top speed80 km/h (50 mph)
System map
Wimbledon London Underground National Rail
Dundonald Road
Merton Park
Morden Road
River Wandle
Phipps Bridge
Belgrave Walk
Mitcham
Mitcham Junction National Rail
Beddington Lane
Therapia Lane
Ampere Way
Waddon Marsh
River Wandle
Wandle Park
Reeves Corner
Centrale
Church Street
West Croydon East London line National Rail
George Street
Wellesley Road
East Croydon National Rail
Lebanon Road
Sandilands
Sandilands Tunnel
Lloyd Park
Coombe Lane
Gravel Hill
Addington Village
Fieldway
King Henry's Drive
New Addington
Addiscombe
Blackhorse Lane
Woodside
Arena
Elmers End National Rail
Harrington Road
Birkbeck National Rail
Avenue Road
Beckenham Road
River Beck
Beckenham Junction National Rail

Tramlink, previously Croydon Tramlink and currently branded as London Trams, is a light rail tram system serving Croydon and surrounding areas in South London, England. It is the first operational tram system serving the London region since 1952. Tramlink is managed by London Trams, a public body part of Transport for London (TfL), and has been operated by FirstGroup since 2017. It is one of two light rail networks in Greater London, the other being the Docklands Light Railway. Tramlink is the fourth-busiest light rail network in the UK behind the Docklands Light Railway, Manchester Metrolink and Tyne and Wear Metro.

Studies for the delivery of a modern-day tram system in Croydon began in the 1960s and detailed planning was performed in the 1980s. Approval of the scheme was received in 1990 and, following a competitive tender process, construction and initial operation of the tramway was undertaken by Tramtrack Croydon (TC) via a 99-year private finance initiative (PFI) contract. The official opening of Tramlink took place on 10 May 2000; by the end of the year three routes were operational. The network consists of 39 stops along 28 km (17 mi) of track, on a mixture of street track shared with other traffic, dedicated track in public roads, and off-street track consisting of new rights-of-way, former railway lines, and one right-of-way where the Tramlink track runs parallel to a third rail-electrified Network Rail line. The network's lines coincide in central Croydon, with eastern termini at Beckenham Junction, Elmers End and New Addington, and a western terminus at Wimbledon, where there is an interchange for London Underground.

Since its original opening, the tram network has been expanded and additional rolling stock has been purchased. During 2008, TfL took over Tramlink operations, ending the PFI and making the company a subsidiary of TfL. Additional rolling stock was introduced during the early 2010s. Furthermore, numerous extensions to the network have been discussed, the most recent of which is the Sutton Link, an extension to connect Sutton to Colliers Wood. Sutton Link was paused in 2020 until funding can be secured. In the 2020s, TfL began work to order new trams for the system.