Tottenham and Forest Gate Railway

Tottenham and Forest Gate Railway
Overview
StatusPart of Gospel Oak to Barking line
OwnerLondon, Tilbury and Southend Railway and Midland Railway and successors
LocaleLondon, England
Stations6
Service
TypeSuburban rail and goods
History
Opened9 July 1894 (1894-07-09)
Technical
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge

The Tottenham and Forest Gate Railway was a railway line in north London, that is now entirely integrated into the London Overground network. Two sections of railway were authorised in 1890 and built as a joint venture between the Midland Railway and the London, Tilbury and Southend Railway. The line and six new stations opened to passengers on 9 July 1894. It provided passenger services to parts of Walthamstow poorly served by existing lines and gave both railway companies access to new territory. It connected with other railways at either end, including the Tottenham and Hampstead Junction Railway, to provide through services to Moorgate, St Pancras, East Ham, Tilbury and Southend. By 1962, the only passenger service was a local train between Barking and Kentish Town. The railway is now part of the Gospel Oak to Barking line and it carries the Suffragette line service of the London Overground.