Thoppumpady BOT Bridge
BOT Bridge | |
|---|---|
Thoppumpady BOT Bridge | |
| Coordinates | 9°56′14″N 76°15′59″E / 9.9372°N 76.2665°E |
| History | |
Engineering design by | Gammon Infrastructure Projects Ltd |
| Constructed by | Gammon Infrastructure Projects Ltd |
| Construction cost | 25.80 crore |
| Opened | 1998 |
| Location | |
Interactive map of BOT Bridge | |
Thoppumpady BOT Bridge, also known as Thoppumpady new Bridge, is a bridge in Thoppumpady, Kochi, Kerala, India. It connects the Kochi's western mainland to Willingdon Island. The new bridge was constructed in 1998; succeeding the old bridge of the same name, which is now known as the Thoppumpady Harbour Bridge, built in 1940. The old bridge, which is a landmark of Kochi is now preserved as a heritage monument and carries only two and three wheelers.
The new Thoppumpady bridge is the first Build-Operate-Transfer bridge in Kerala. It was built as a joint project of the Government of Kerala, the Greater Cochin Development Authority and Gammon India.