The Edison (skyscraper)
| The Edison | |
|---|---|
Interactive map of the The Edison area | |
General information | |
| Status | Approved |
| Location | 1005 North Edison Street, Milwaukee, Wisconsin |
| Coordinates | 43°02′37″N 87°54′45″W / 43.0436569734289°N 87.91254953947164°W |
| Groundbreaking | June, 2025 |
| Height | |
| Height | 362 feet (110 m) |
| Technical details | |
| Floor count | 31 |
| Design and construction | |
| Architect | Thronton Tomasetti |
| Developer | Neutral |
| Main contractor | C.D. Smith |
| Other information | |
| Parking | 288 |
The Edison is a planned 31-story high-rise tower in Milwaukee, Wisconsin. Developed by Madison-based developer Neutral, the tower is planned to stand at a height of 362 feet (110 m), containing 378 luxury apartment units upon completion and will become the new tallest mass timber building in the world and surpassing the current record holder, the Ascent MKE. Construction of the tower first began in June of 2025.
In September of 2025, construction was halted due to significant cost issues and failure to pay the Fond du Lac-based general contractor C.D. Smith Construction, cited by Neutral as a result of the Trump administration's tarrifs, with Milwaukee County Circuit Court Judge Glen Yamahiro defaulting the property on 29 June, 2026.