OwnerNTA
Area servedTel Aviv metropolitan area
Transit typeLight rail interchange Light rail
Number of lines
3 (Red Line, Green Line, Purple Line)
Number of stations
34 (Red Line), 58 (Green Line), 43 (Purple Line)
Daily ridership
Red Line – 100,000
HeadquartersTel Aviv
Websitehttps://www.dankal.co.il/
Operation
Began operation
August 18, 2023 (August 18, 2023)
OperatorTevel Metro
Rolling stockCRRC Changchun LRV (Red Line), Alstom Citadis X05 (Green Line), CAF Urbos 100 (Purple Line)
Technical
Track gauge1,435 mm
Top speed80 km/h (50 mph) in underground sections
Map of the planned network as of 2020. The Red Line is in service; the Green and Purple lines are under construction; the rest is subject to change.

The Tel Aviv Light Rail, also known as Dankal, is a mass transit system for Gush Dan, the Tel Aviv metropolitan area in central Israel. The system will include different modes of mass transit, including rapid transit (metro), light rail transit (LRT), and bus rapid transit (BRT). Overseen by NTA Metropolitan Mass Transit System Ltd., a government agency, the project will complement the intercity and suburban rail network operated by Israel Railways.

As of 2023, two LRT lines are under construction and one available to the public. Work on the Red Line, the first in the project, started on September 21, 2011, following years of preparatory works, and was opened on August 18, 2023, after numerous delays. Construction of the Purple Line started in December 2018; work on the Green Line began in January 2019.

The network was originally planned to be called "MetroTLV" but was changed to "Dankal". The name comes from the metropolitan area of Tel Aviv, Gush Dan, and "light" ("kal", Hebrew: קל).