New South Wales A and B sets

A and B sets
A4 at Ashfield (above) and B9 at Carlton (bottom)
Lower deck of an A set
Stock typeElectric multiple units
In service
  • 1 July 2011–present (A sets)
  • 7 September 2018–present (B sets)
Manufacturers
AssemblyCardiff, Australia
Built atChangchun, China
ReplacedS sets (A1-A3-A78-A80, B1-B24)
C sets (B25-B41)
Constructed
  • 2010–2014 (A sets)
  • 2017–2021 (B sets)
Entered service
  • 1 July 2011 (2011-07-01) (A sets)
  • 7 September 2018 (2018-09-07) (B sets)
Number built
  • 791⁄2 A sets (636 carriages)
  • 41 B sets (328 carriages)
Number in service
  • 78 A sets (624 carriages)
  • 41 B sets (328 carriages)
Number scrapped10 carriages (8-car set A2, 2 prototype motor cars)
Formation119 8 car sets
D–N–N–T–T–N–N–D
Fleet numbers
  • A1, A3–A78, A80
  • B1–B41
Capacity
  • 894 seated including 16 wheelchair spaces (101 in driving cars, 118 in power cars, 110 in trailer cars)
  • 1200 nominal peak
  • 2150 fully loaded (single destination/special event)
OperatorSydney Trains
DepotsAuburn
Hornsby
Lines served
Specifications
Car body constructionStainless steel
Train length163.1 m (535 ft 1+1⁄4 in)
Car length
  • 20,732 mm (68 ft 1⁄4 in) (D)
  • 20,243 mm (66 ft 5 in) (N)
  • 20,332 mm (66 ft 8+1⁄2 in) (T)
Width3,035 mm (9 ft 11+1⁄2 in)
Height4.41 m (14 ft 5+5⁄8 in)
Floor height
  • 1.27 m (50 in) (rail top to floor)
  • 1.97 m (77+1⁄2 in) (between floor and roof)
DoorsPlug-style, 2 per side
Wheel diameter940 mm (37 in)
Wheelbase2.3 m (7 ft 6+1⁄2 in)
Maximum speed
  • 143 km/h (89 mph) (design)
  • 130 km/h (81 mph) (service)
Weight407 t (401 long tons; 449 short tons)
Axle load17 t (17 long tons; 19 short tons)
Traction systemHitachi 2-level IGBT–VVVF spread spectrum modulation
Traction motors16 × Hitachi 183 kW (245 hp) 3-phase AC induction motor
Power output2,928 kW (3,927 hp)
Acceleration1.03 m/s2 (3.4 ft/s2)
Deceleration
  • 1.05 m/s2 (3.4 ft/s2) (service)
  • 1.28 m/s2 (4.2 ft/s2) (emergency)
HVAC2 independent cooling units per car: 38 kW (51 hp) cooling, 24 kW (32 hp) heating
Electric systems1,500 V DC (nominal) from overhead catenary
Current collectionPantograph
UIC classification2′2′+Bo′Bo′+Bo′Bo′+2′2′+2′2′+Bo′Bo′+Bo′Bo′+2′2′
Braking systemKnorr-Bremse regenerative brake with blended electro-pneumatic wheel mounted disc brakes
Safety systemETCS
Coupling system
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Notes/references

The A and B sets, also referred to as the Waratah trains, are classes of double-decker electric multiple units (EMU) that operate on the Sydney Trains network in New South Wales, Australia. Based on the earlier M sets, the Waratahs were manufactured by a joint consortium between CRRC, Downer Rail and Hitachi, with initial construction taking place overseas in Changchun before final assembly at Downer Rail's Cardiff Locomotive Workshops. The sets were named after the Waratah flower, which is the state's floral emblem.

The initial order for 78 A sets was the largest rolling stock order in Australia's history. These 624 A set carriages make up around half of the Sydney Trains fleet and replaced two-thirds of the 498 S set carriages. Delivery commenced in July 2011 and was completed in June 2014.

An order for 24 additional trains with updated technology and a lightly revised design was placed in December 2016. These are classified as B sets, or colloquially as Waratah Series 2 trains. The delivery of the first order of sets began in September 2018 and was completed in June 2019, while a second and final order of a further 17 sets began in September 2020 and was completed in June 2021.