Surat Metro
| Surat Metro | |
|---|---|
| Overview | |
| Owner | Gujarat Metro Rail Corporation Limited |
| Locale | Surat, Gujarat |
| Transit type | Rapid Transit |
Number of lines | 2 (Phase - I) |
| Line number |
|
Number of stations | 38 |
| Website | Gujarat Metro |
| Operation | |
Operation will start | December 2027 |
| Character | Elevated & Underground |
| Rolling stock | Titagarh Rail Systems |
| Technical | |
| System length | 40.35 kilometres (25.07 mi) |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
| Electrification | 750 V DC third rail |
| Average speed | 80 km/h |
Surat Metro is an under-construction rapid transit system for the city of Surat in Gujarat state of India. Two corridors with a combined length of 40.35 kilometers are under construction since 18 January 2021. The project is expected to be completed by December 2026 at an estimated cost of ₹12,020.32 crore (US$1.2 billion).