Sungai Buloh station

 KA08   PY04  Sungai Buloh
The station's signboard after being transferred to the Putrajaya Line, with a trainset entering the station from Kampung Batu.
General information
Other names
LocationSungai Buloh
Selangor
Malaysia
Coordinates3°12′22″N 101°34′49″E / 3.20611°N 101.58028°E / 3.20611; 101.58028
SystemRapid KL (MRT)
Owner
  • Railway Assets Corporation (KTM)
  • MRT Corp (MRT)
Operator
Lines
Platforms
Tracks
  • 4 (KTM)
  • 2 (MRT)
Construction
Structure type
  •  KA08  At-grade
  •  PY04  Elevated
ParkingAvailable with payment (1,236 parking bays, 258 motorcycle bays)
Cycle facilities
Available (16 bicycle bays)
AccessibleYes
Other information
Station code
  •  KA08   PY04  (from 16 June 2022)
  •  SBK01  (until 15 June 2022)
History
Opened
  • 1892 (1892) (KTM)
  • 16 December 2016 (2016-12-16) (Kajang Line)
  • 16 June 2022 (2022-06-16) (Putrajaya Line)
Rebuilt2016 (2016) (KTM)
Electrified1995 (1995) (KTM)
Services
Preceding station KTM Komuter Following station
Kuang Tanjung Malim–Port Klang Line Kepong Sentral
towards Port Klang
Preceding station ETS Following station
Ipoh
towards Padang Besar
KL Sentral–Padang Besar (Express) Kuala Lumpur
Tanjung Malim
towards Padang Besar
KL Sentral–Padang Besar (Platinum)
Tanjung Malim
towards Butterworth
KL Sentral–Butterworth (Platinum)
Tanjung Malim
towards Padang Besar
Padang Besar–JB Sentral (Platinum) Kuala Lumpur
Tanjung Malim
towards Butterworth
Butterworth–JB Sentral (Platinum)
Rawang
towards Padang Besar
Padang Besar–JB Sentral (Gold)
Batang Kali
towards Butterworth
Butterworth–Segamat (Gold) Kuala Lumpur
towards Segamat
Rawang
towards Ipoh
KL Sentral–Ipoh (Gold) Kepong Sentral
Preceding station Following station
Kampung Selamat Putrajaya Line Damansara Damai
Location

The Sungai Buloh station is an integrated train station serving the suburb of Sungai Buloh in Selangor, Malaysia. It is located to the northwest of Malaysia's capital city, Kuala Lumpur.

It is an interchange station, with one section catering to KTM Komuter's Tanjung Malim–Port Klang Line and KTM ETS services, and another section for the Putrajaya Line (formerly the Kajang Line). However, there is no paid-area integration between the two sections as the two services use different ticketing systems and are operated by two different companies. The newly built integrated station was opened on 16 December 2016 together with the opening of the first phase of the MRT Sungai Buloh - Kajang Line (now known as the MRT Kajang Line).

The station was the northern terminus of the MRT Kajang Line until October 8, 2021 after which the MRT portion of the station was closed along with Kampung Selamat and Kwasa Damansara until the opening of the MRT Putrajaya Line.

The station was temporarily closed for migration work for the MRT SSP Line / MRT Putrajaya Linefrom November 17-18, 2018 for early track and system connection works, March 9-10, 2019 for track switch installation for depot access, June 27-28 & November 14-15, 2020 for further migration works. The station was closed on October 9, 2021 till the official opening of MRT Putrajaya Line Phase 1 on 16 June 2022.