State of Maine (ship)
State of Maine arriving at Portland, Maine in March 2026 | |
| History | |
|---|---|
| Name | State of Maine |
| Namesake | Maine |
| Owner | United States Maritime Administration (MARAD) |
| Operator | Maine Maritime Academy |
| Builder | Hanwha Philly Shipyard, Philadelphia |
| Laid down | 1 May 2023 |
| Christened | 26 August 2025 |
| In service | 30 March 2026 |
| Home port | Castine, Maine |
| Identification | Call sign: WDU2012; IMO number: 9929546 |
| Status | In service |
| General characteristics | |
| Class & type | National Security Multi-Mission Vessel (NSMV III) |
| Tonnage | 25,985 GT; 7,795 NT |
| Displacement | 19,585 t (19,276 long tons) (load line) |
| Length | 160.05 m (525 ft 1 in) overall; 154 m (505 ft 3 in) between perpendiculars |
| Beam | 27 m (88 ft 7 in) |
| Draft | 7.35 m (24 ft 1 in) (summer load line) |
| Depth | 16.8 m (55 ft 1 in) (main deck) |
| Installed power | 16,800 kW (22,500 hp) total |
| Propulsion | 4 × GE Wabtec diesel generators; 2 × GE Energy propulsion motors; single propeller (5.85 m diameter); bow and stern thrusters |
| Speed | 18 knots (33 km/h; 21 mph) (design) |
| Range | 11,000 nmi (20,000 km; 13,000 mi) (at 18 knots, class standard) |
| Capacity | 600 cadets + up to 160 crew/faculty/staff (max 760 personnel); designed for training and humanitarian aid/disaster relief (HADR) |
| Complement | 100 officers, faculty, staff, and crew (typical) |
State of Maine (also known as NSMV 3 or Training Ship State of Maine) is the third of five National Security Multi-Mission Vessels built for the U.S. state maritime academies. It serves as the primary training ship for Maine Maritime Academy (MMA) cadets while also being available for federal humanitarian assistance and disaster relief (HADR) missions. It is the first purpose-built training vessel for the academy and replaces the previous State of Maine, which served from 1997 until 2024.
Category:
- IMO numbers