Stadler SMILE
| Stadler SMILE SBB RABe 501 (Giruno) | |
|---|---|
SBB RABe 501 on test run between Erien and Romanshorn | |
| Stock type | Electric multiple unit |
| In service | 2019– |
| Manufacturer | Stadler Rail |
| Replaced | |
| Constructed | 2017, 2024– (Commissioning) |
| Capacity |
|
| Operators | |
| Specifications | |
| Car body construction | Aluminium |
| Train length | 202 m (662 ft 9 in) |
| Car length |
|
| Width | 2.9 m (9 ft 6 in) |
| Height | 4,255 mm (13 ft 11.5 in) |
| Floor height |
|
| Wheel diameter | 920–840 mm (36–33 in) (new–worn) |
| Wheelbase |
|
| Maximum speed |
|
| Weight | 380 t (370 long tons; 420 short tons) (unladen) |
| Traction system | ABB BORDLINE CC1500 MS 25-15-3kV U 1600 059A01 3-level IGBT–VVVF |
| Traction motors | 8 × TSA TMF 50-33-4 600 kW (805 hp) asynchronous 3-phase AC |
| Power output | 4,800 kW (6,440 hp) |
| Tractive effort | 300 kN (67,400 lbf) |
| Electric systems | |
| Current collection | 1,450 mm (4 ft 9 in) and 1,950 mm (6 ft 5 in) wide pantographs |
| UIC classification | 2′(Bo)′(Bo)′(2)′(2)′(2)′(2)′(Bo)′(Bo)′(2)′(2)′2′ |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
| Notes/references | |
| Sourced from unless otherwise stated. | |
The Stadler SMILE is a high-speed electric multiple unit train built by Stadler Rail of Switzerland for the Swiss Federal Railways (SBB) and Westbahn from 2017. According to Stadler, it was the world's first single-decker low-floor high-speed train.
The trains replaced the RABe 503 trains on the trans-Alpine route between Milan and Basel / Zurich, and are to be used for further connections to Germany and Austria. The main route goes through the 57 kilometres (35 mi) Gotthard Base Tunnel. As a consequence, the SMILE is also referred to as the "Gotthard train".
The 11-car units operate with a top speed of 250 km/h (155 mph) and can accommodate up to 403 passengers (117 in first class, 286 in second class). Two train sets can be coupled together to accommodate over 800 passengers.