Southern Pacific 2472

Southern Pacific 2472
SP No. 2472 at the Niles Canyon Railway
Type and origin
Power typeSteam
BuilderBaldwin Locomotive Works
Serial number54477
Build dateMarch 1921
Rebuild dateNovember 29, 1940
Specifications
Configuration:
​
 • Whyte4-6-2
 • UIC2'C1'
Gauge4 ft 8+1⁄2 in (1,435 mm) standard gauge
Driver dia.73 in (1,854 mm)
Wheelbase75.80 ft (23.10 m) ​
 • Engine35.50 ft (10.82 m)
 • Drivers13 ft (4.0 m)
Axle load60,700 lb (27,500 kg)
Adhesive weight180,000 lb (82,000 kg)
Loco weight297,800 lb (135,100 kg)
Tender weight160,800 lb (72,900 kg)
Total weight457,800 lb (207,700 kg)
Fuel typeOil
Fuel capacity4,000 US gal (15,000 L; 3,300 imp gal)
Water cap.12,000 US gal (45,000 L; 10,000 imp gal)
Firebox:​
 • Grate area70.40 sq ft (6.540 m2)
Boiler pressure210 psi (1.4 MPa)
Heating surface:​
 • Firebox283 sq ft (26.3 m2)
Cylinder size25 in × 30 in (635 mm × 762 mm)
Valve gearWalschaerts
Valve typePiston valves
Loco brakeAir
Train brakesAir
CouplersKnuckle
Performance figures
Tractive effort46,800 lbf (208.18 kN)
Factor of adh.4.15
Career
Operators
ClassP-8
Number in class15
NumbersSP 2472
DeliveredApril 15, 1921
Last runJanuary 1957
RetiredFebruary 7, 1957
PreservedApril 10, 1959
RestoredApril 30, 1991
Current ownerGolden Gate Railroad Museum
DispositionUndergoing 1,472-day inspection and overhaul
Reference:

Southern Pacific 2472 is a P-8 class 4-6-2 "Pacific" type steam locomotive built in March 1921 by the Baldwin Locomotive Works (BLW) for the Southern Pacific Railroad (SP). It is among three surviving P-8 class, the others are Nos. 2467 and 2479. The locomotive was used to haul passenger trains until it was retired in 1957, and was then donated to be placed on static display at the San Mateo County Fairgrounds. After being restored to operational condition in the early 1990s, the locomotive pulled excursion trains on the Niles Canyon Railway until 2015. It was then moved to the Northwestern Pacific Railroad, where, as of 2023, is undergoing its Federal Railroad Administration (FRA) mandated 1,472 day inspection and overhaul.