Réseau express métropolitain

Réseau express métropolitain
A REM train at Brossard station
A REM train at Brossard station
Overview
OwnerCDPQ Infra
LocaleGreater Montreal, Quebec
Transit typeLight metro
Number of lines
1 (3 branches)
Number of stations
23 (2 under construction)
Daily ridership
190,000 (projected, complete)
78,000 (November 2025 - May 2026, A1 + A4)
Websiterem.info/en
Operation
Began operation
31 July 2023 (2023-07-31)
OperatorsPulsar (Alstom and AtkinsRéalis), formerly known as Groupe PMM
Character
  • elevated: 21.5 km (13.4 mi)
  • underground: ~8.6 km (5.3 mi)
  • at-grade: ~36.9 km (22.9 mi)
Rolling stockAlstom Metropolis Saint-Laurent
Number of vehicles
212 cars
Train length
  • 4 cars
  • 2 cars off peak
Technical
System length
  • 64 km (40 mi)
  • 67 km (42 mi) (final phase)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
ElectrificationOverhead line, 1,500 V DC
Top speed100 km/h (62 mph)
System map

  in operation   future
Saint-Eustache
Maintenance Centre
enlarge… Deux-Montagnes
Grand-Moulin
Zone C
Zone B
Sainte-Dorothée
Île-Bigras
Zone B
Zone A
Pierrefonds-Roxboro
Anse-à-l'Orme Depot
Sunnybrooke
Anse-à-l'Orme enlarge…
Kirkland
(Opens 2027)
Fairview–Pointe-Claire
Montréal–Trudeau International Airport
YUL–Aéroport-
Montréal–Trudeau
enlarge…
Des Sources
Marie-Curie
enlarge… Bois-Franc
Du Ruisseau
Montpellier
enlarge… Côte-de-Liesse
Ville-de-Mont-Royal
Canora
Édouard-Montpetit
McGill
enlarge…
Gare
Centrale
Griffintown–
Bernard-Landry
(planned)
Bridge–Bonaventure
(planned)
Île-des-Soeurs
Zone A
Zone B
Panama
Du Quartier
enlarge… Brossard
Brossard Depot

Handicapped/disabled access All stations are accessible

The Réseau express métropolitain (REM, French: [ʁezo ekspʁɛs metʁɔpɔlitɛ̃], lit. 'Metropolitan Express Network') is a light metro rapid transit system in Greater Montreal, Quebec, Canada. As of May 2026, it consists of 23 stations spanning the 64 kilometres (40 mi) of its A1, A3, and A4 branches, connecting Downtown Montreal with the suburb of Brossard and the northwestern Montreal suburbs. The A2 branch to the Montréal–Trudeau International Airport will open in 2027. A portion of the route was taken over from the Exo commuter rail Deux-Montagnes line and has been converted to light metro standards.

The 67-kilometre (42 mi) driverless metro system is projected to cost CA$8.34 billion. It is independent of, but connects to and complements, the existing Montreal Metro operated by the STM, as well as the Exo commuter rail. It is fully fare-integrated with ARTM's system. Trains on the network are fully automated and driverless, as well as equipped with air conditioning for summer operations. All stations on the network are heated, and the system's three underground stations are also air-conditioned. The network features platform screen doors at every station.

The line was built by CDPQ Infra, a subsidiary of the Caisse de dépôt et placement du Québec, an institutional investor that manages various public and para-public pension plans and insurance programs in Quebec. The first section of the REM between the Brossard on the South Shore and Central Station in Downtown Montreal opened on 31 July 2023. The system was formally inaugurated on 14 November 2025 in a ceremony attended by Prime Minister Mark Carney, Premier of Quebec François Legault and Mayor of Montreal Soraya Martinez Ferrada. The second section of the REM opened on 17 November 2025, extending the line north through the Mont Royal Tunnel and to the northwest to Deux-Montagnes. The third section of the REM opened on 18 May 2026, extending the line west to Anse-à-l'Orme.