Shenzhou 11
Launch of Shenzhou 11 on a Long March 2F/G | |
| Mission type | Tiangong-2 crew transport |
|---|---|
| Operator | China Manned Space Agency |
| COSPAR ID | 2016-061A |
| SATCAT no. | 41812 |
| Mission duration | 32 days, 6 hours, 29 minutes |
| Orbits completed | 507 |
| Spacecraft properties | |
| Spacecraft type | Shenzhou |
| Manufacturer | China Aerospace Science and Technology Corporation |
| Crew | |
| Crew size | 2 |
| Members | Jing Haipeng Chen Dong |
| Start of mission | |
| Launch date | 16 October 2016, 23:30:31 UTC (17 October, 07:30:31 CST) |
| Rocket | Long March 2F/G (Y11) |
| Launch site | Jiuquan, LA-4/SLS-1 |
| Contractor | China Academy of Launch Vehicle Technology |
| End of mission | |
| Landing date | 18 November 2016, 05:59:38 UTC |
| Landing site | Inner Mongolia (42°29′11.7″N 112°42′57.36″E / 42.486583°N 112.7159333°E) |
| Orbital parameters | |
| Reference system | Geocentric orbit |
| Regime | Low Earth orbit |
| Perigee altitude | 379 km (235 mi) |
| Apogee altitude | 389 km (242 mi) |
| Inclination | 42.78° |
| Docking with Tiangong-2 | |
| Docking date | 18 October 2016, 19:24 UTC |
| Undocking date | 17 November 2016, 04:41 UTC |
| Time docked | 29 days, 9 hours, 17 minutes |
Mission insignia Haipeng and Dong | |
Shenzhou 11 was a crewed spaceflight of the Shenzhou program of China, launched on 17 October 2016 (16 October UTC) from the Jiuquan Satellite Launch Center. It was China's sixth crewed space mission, at 33 days, it was the longest until the follow-up Shenzhou 12 mission which lasted 3 months. Two days after launch, it docked with the Tiangong-2 space laboratory, which had been launched on 15 September 2016. Shenzhou 11 was the first and only expedition and mission to Tiangong-2 in this portion of the Tiangong program.