Salisbury railway station, Brisbane
Salisbury | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
Dollis Street station entrance in March 2026 | |||||||||||
| General information | |||||||||||
| Location | Olivia Avenue, Salisbury | ||||||||||
| Coordinates | 27°33′14″S 153°01′22″E / 27.5539°S 153.0228°E | ||||||||||
| Owner | Queensland Rail | ||||||||||
| Operator | Queensland Rail | ||||||||||
| Line | T6 Beenleigh | ||||||||||
| Distance | 13.02 kilometres from Central | ||||||||||
| Platforms | 2 (1 island) | ||||||||||
| Tracks | 3 | ||||||||||
| Construction | |||||||||||
Structure type | Ground | ||||||||||
| Parking | 203 bays (4 accessible bays, 12 motorcycle bays) | ||||||||||
Cycle facilities | Yes | ||||||||||
| Other information | |||||||||||
| Status | Staffed part-time | ||||||||||
| Station code | 600201 (platform 1) 600202 (platform 2) | ||||||||||
| Fare zone | Zone 2 | ||||||||||
| Website | Translink | ||||||||||
| History | |||||||||||
| Opened | 1885 | ||||||||||
| Rebuilt | 2 March 2026 | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Salisbury is a railway station operated by Queensland Rail on the Beenleigh line. It opened in 1885 and serves the Brisbane suburb of Salisbury. It is a ground level station, featuring one island platform with two faces.
In September 1930, Salisbury became a junction with the opening of the standard gauge NSW North Coast line.
In 1996, as part of the construction of the Gold Coast line, the standard gauge line was converted to dual gauge.
Originally, the station had 49 parking bays across the two existing Park 'n' Ride facilities on Lillian Avenue. In 2021, a new Park 'n' Ride facility located on Lillian Avenue/Dollis Street (western side of the railway) opened, increasing the number of car bays and decreasing parking on local streets. The station had 135 parking bays, plus 12 motorcycle bays. All accessible parking bays are located in the existing car park.
In 2024 as part of the Cross River Rail project, Salisbury station will receive a full accessibility upgrade with major changes being a new third platform, upgraded overpass with lifts, a new station building and more. The station closed on 9 December 2024 and was reopened on 2 March 2026.
A business case has been opened by the Government of Australia and Queensland Government for a proposed passenger rail service from Salisbury to Beaudesert, which would use the existing NSW TrainLink railway from Salisbury to Undullah, then a soon to be built railway from Undullah to Beaudesert.